ITAC Assessment: AS0132
ITAC logo
ITAC Assessment: AS0132
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Cable Connectors
NAICS
n/a
SIC 3663: Radio and Television Broadcasting and Communications Equipment
Sales Range $50
M
to 100
M
# of Employees 415
Plant Area 130,000
ft2
Annual Production 48,000,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $540,970 8,056,272
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,543 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,749

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4322: Use or replace with energy efficient substitutes $29,169 $75,000 $29,169
327,081
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,073 $770 $1,073
16,120
kWh
03 2.4133: Use most efficient type of electric motors $22,467 $23,982 $22,467
334,701
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,170 - $3,170
47,186
kWh
05 2.7134: Use photocell controls $142 $120 $142
2,052
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,194 $5,166 $3,194
47,479
kWh
07 2.7261: Install timers and/or thermostats $3,483 $1,715 $3,483
51,876
kWh
08 2.7232: Replace existing hvac unit with high efficiency model $13,845 $32,760 $13,845
206,331
kWh
TOTAL RECOMMENDED $76,543 $139,513 $76,543
1,032,826
kWh
TOTAL IMPLEMENTED $43,749 $62,678 $43,749
651,817
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs