ITAC Assessment: MA0318
ITAC logo
ITAC Assessment: MA0318
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product laser systems
NAICS
n/a
SIC 3661: Telephone and Telegraph Apparatus
Sales Range $10
M
to 50
M
# of Employees 53
Plant Area 60,000
ft2
Annual Production 36
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,399 1,570,047
kWh
LPG $2,743 284
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,609 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,319

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Solid Waste (non-haz) Savings
01 2.7224: Reduce space conditioning during non-working hours $8,673 $4,305 $8,673
105,217
kWh
- -
02 2.4323: Use optimum size and capacity equipment $7,659 $3,520 $7,659
92,907
kWh
- -
03 2.2437: Recover waste heat from equipment $3,319 $521 $3,319
63,599
kWh
- -
04 2.3212: Optimize plant power factor $2,338 $4,349 $2,338
-
kWh
- -
05 2.7231: Use radiant heater for spot heating $1,100 $1,410 - $1,100
-
MMBtu
-
06 3.1191: Change procedures / equipment / operating conditions $6,000 $500 - - $6,000
-
lb
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,520 $383 - - $2,520
-
lb
TOTAL RECOMMENDED $31,609 $14,988 $21,989
261,723
kWh
$1,100
-
MMBtu
$8,520
-
lb
TOTAL IMPLEMENTED $3,319 $521 $3,319
63,599
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs