| Assessment Year | 1994 |
|---|---|
| Principal Product | laser systems |
| NAICS |
n/a
|
| SIC | 3661: Telephone and Telegraph Apparatus |
| Sales Range | $10 M to 50M |
| # of Employees | 53 |
| Plant Area |
60,000
ft2
|
| Annual Production | 36
pieces
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $129,399 | 1,570,047 |
kWh
|
$0.082 |
| LPG | $2,743 | 284 |
MMBtu
|
$9.66 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $31,609 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,319 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7224: Reduce space conditioning during non-working hours | $8,673 | $4,305 |
$8,673
105,217
kWh
|
- | - | |
| 02 | 2.4323: Use optimum size and capacity equipment | $7,659 | $3,520 |
$7,659
92,907
kWh
|
- | - | |
| 03 | 2.2437: Recover waste heat from equipment | $3,319 | $521 |
$3,319
63,599
kWh
|
- | - | |
| 04 | 2.3212: Optimize plant power factor | $2,338 | $4,349 |
$2,338
-
kWh
|
- | - | |
| 05 | 2.7231: Use radiant heater for spot heating | $1,100 | $1,410 | - |
$1,100
-
MMBtu
|
- | |
| 06 | 3.1191: Change procedures / equipment / operating conditions | $6,000 | $500 | - | - |
$6,000
-
lb
|
|
| 07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $2,520 | $383 | - | - |
$2,520
-
lb
|
|
| TOTAL RECOMMENDED | $31,609 | $14,988 |
$21,989
261,723
kWh
|
$1,100
-
MMBtu
|
$8,520
-
lb
|
||
| TOTAL IMPLEMENTED | $3,319 | $521 |
$3,319
63,599
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs