Assessment Year | 1992 |
---|---|
Principal Product | PLASTIC PACKAGING |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
n/a
|
Annual Production | 3,500,000
lb
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $486,020 | 6,241,501 |
kWh
|
$0.078 |
Fuel Oil #2 | $7,383 | 1,427 |
MMBtu
|
$5.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $46,999 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,892 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $15,804 | $17,400 |
$15,804
-
kWh
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,470 | $25 |
$9,470
121,630
kWh
|
- | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $5,783 | $3 |
$8,010
102,872
kWh
|
$(-2,227.0)
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,883 | $10,121 |
$4,883
62,720
kWh
|
- | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,628 | $400 |
$3,628
46,600
kWh
|
- | |
06 | 2.2511: Insulate bare equipment | $2,122 | $720 |
$2,122
27,257
kWh
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,985 | $900 |
$1,985
25,498
kWh
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $1,734 | $360 |
$1,734
22,274
kWh
|
- | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,209 | - |
$1,209
15,533
kWh
|
- | |
10 | 2.2122: Install / repair insulation on condensate lines | $200 | $300 | - |
$200
-
MMBtu
|
|
11 | 2.2514: Cover open tanks | $181 | $285 | - |
$181
-
MMBtu
|
|
TOTAL RECOMMENDED | $46,999 | $30,514 |
$48,845
424,384
kWh
|
$(-1,846.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $28,892 | $12,109 |
$30,919
397,127
kWh
|
$(-2,027.0)
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs