184
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
SF0605 #07 Y:2023 | 07 | 2023 | Use solar heat to make electricty | $129,996 | $428,510 | |
SF0605 #06 Y:2023 | 06 | 2023 | Use a less expensive method of waste removal | $21,756 | $37,440 | |
SF0605 #05 Y:2023 | 05 | 2023 | Insulate bare equipment | $233 | $1,287 | |
SF0605 #04 Y:2023 | 04 | 2023 | Install occupancy sensors | $2,116 | $10,832 | |
SF0605 #03 Y:2023 | 03 | 2023 | Utilize controls to operate equipment only when needed | $28,696 | $38,888 | |
SF0605 #02 Y:2023 | 02 | 2023 | Eliminate or reduce compressed air usage | $848 | $420 | |
SF0605 #01 Y:2023 | 01 | 2023 | Reduce space conditioning during non-working hours | $24,945 | $4,958 | |
MI0366 #08 Y:2019 | 08 | 2019 | Install occupancy sensors | $1,690 | $1,188 | |
MI0366 #07 Y:2019 | 07 | 2019 | Use optimum size and capacity equipment | $1,903 | $4,341 | |
MI0366 #06 Y:2019 | 06 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,463 | $1,980 | |
MI0366 #05 Y:2019 | 05 | 2019 | Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $3,258 | $2,265 | |
MI0366 #04 Y:2019 | 04 | 2019 | Use photocell controls | $3,435 | $4,831 | |
MI0366 #03 Y:2019 | 03 | 2019 | Reduce the pressure of compressed air to the minimum required | $5,152 | $120 | |
MI0366 #02 Y:2019 | 02 | 2019 | Reduce illumination to minimum necessary levels | $4,035 | $1,115 | |
MI0366 #01 Y:2019 | 01 | 2019 | Utilize higher efficiency lamps and/or ballasts | $50,590 | $93,076 | |
SD0564 #05 Y:2018 | 05 | 2018 | Reduce the pressure of compressed air to the minimum required | $973 | $400 | |
SD0564 #04 Y:2018 | 04 | 2018 | Use photocell controls | $1,676 | $2,046 | |
SD0564 #03 Y:2018 | 03 | 2018 | Use most efficient type of electric motors | $5,302 | $2,468 | |
SD0564 #02 Y:2018 | 02 | 2018 | Utilize higher efficiency lamps and/or ballasts | $8,666 | $27,785 | |
SD0564 #01 Y:2018 | 01 | 2018 | Recharge batteries on during off-peak demand periods | $17,517 | $86,400 |