ITAC Assessment: MI0366
ITAC logo
ITAC Assessment: MI0366
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Automotive Accessories
NAICS 334310: Audio and Video Equipment Manufacturing
SIC 3651: Household Audio and Video Equipment
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 180,600
ft2
Annual Production 6,000,000
pieces
Production Hrs. Annual 2,601
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $240,815 4,770,409
kWh
Electricity Demand $141,323 12,914
kW-mo/yr
Electricity Fees $81,804 -
TOTAL YEARLY COSTS $463,942
RECOMMENDED SAVINGS* $71,526 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $50,590 $93,076 $25,049
500,979
kWh
$25,541
-
kW-mo/yr
02 2.7111: Reduce illumination to minimum necessary levels $4,035 $1,115 $4,035
80,693
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $5,152 $120 $3,368
67,363
kWh
$1,784
-
kW-mo/yr
04 2.7134: Use photocell controls $3,435 $4,831 $3,435
68,706
kWh
-
05 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $3,258 $2,265 $3,499
69,971
kWh
$(-241.0)
-
kW-mo/yr
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,463 $1,980 $959
19,188
kWh
$504
-
kW-mo/yr
07 2.4323: Use optimum size and capacity equipment $1,903 $4,341 $1,159
23,174
kWh
$744
-
kW-mo/yr
08 2.7135: Install occupancy sensors $1,690 $1,188 $1,690
33,804
kWh
-
TOTAL RECOMMENDED $71,526 $108,916 $43,194
863,878
kWh
$28,332
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs