ITAC Assessment: SD0564
ITAC logo
ITAC Assessment: SD0564
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Corrugated Boxes
NAICS 322219: Other Paperboard Container Manufacturing
SIC 3652: Phonograph Records and Prerecorded Audio Tapes and Disks
Sales Range $10
M
to 50
M
# of Employees 82
Plant Area 65,000
ft2
Annual Production 24,774,607
units
Production Hrs. Annual 7,344
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,798 1,617,757
kWh
Electricity Demand $76,562 4,301
kW-mo/yr
Electricity Fees $11,780 -
TOTAL YEARLY COSTS $235,140
RECOMMENDED SAVINGS* $34,134 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,517

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.3132: Recharge batteries on during off-peak demand periods $17,517 $86,400 $(-1,349.0)
(-14,865)
kWh
$18,866
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,666 $27,785 $6,228
68,670
kWh
$2,146
-
kW-mo/yr
$292
03 2.4133: Use most efficient type of electric motors $5,302 $2,468 $4,202
46,333
kWh
$1,100
-
kW-mo/yr
-
04 2.7134: Use photocell controls $1,676 $2,046 $1,599
17,626
kWh
$77
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $973 $400 $973
10,722
kWh
- -
TOTAL RECOMMENDED $34,134 $119,099 $11,653
128,486
kWh
$22,189
-
kW-mo/yr
$292
TOTAL IMPLEMENTED $17,517 $86,400 $(-1,349.0)
(-14,865)
kWh
$18,866
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs