Assessment Year | 1996 |
---|---|
Principal Product | Cylinder Heads and Other Parts for Aircraft |
NAICS |
n/a
|
SIC | 3440: |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
70,000
ft2
|
Annual Production | 146,000
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $338,705 | 4,708,382 |
kWh
|
$0.072 |
Electricity Demand | $130,728 | 13,128 |
kW-mo/yr
|
$9.96 |
Electricity Fees | $469,433 | - |
|
- |
Natural Gas | $97,661 | 22,706 |
MMBtu
|
$4.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $88,069 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $88,069 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $4,983 | $4,130 |
$4,983
53,927
kWh
|
- | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,640 | $350 | - |
$2,640
-
kW-mo/yr
|
- | - | - | |
03 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $3,241 | $4,860 |
$3,241
46,307
kWh
|
- | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,990 | $11,477 | - |
$10,990
-
kW-mo/yr
|
- | - | - | |
05 | 2.7144: Install spectral reflectors / delamp | $8,674 | $6,355 | - |
$8,674
-
kW-mo/yr
|
- | - | - | |
06 | 2.7135: Install occupancy sensors | $582 | $484 | - |
$582
-
kW-mo/yr
|
- | - | - | |
07 | 3.1244: Reduce solution drag-out to prevent solution loss | $26,348 | - | - | - |
$26,348
-
gal
|
- | - | |
08 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $5,300 | $9,000 | - | - | - | - | $5,300 | |
09 | 3.5131: Recycle white water | $7,791 | $750 | - | - |
$7,791
-
gal
|
- | - | |
10 | 3.3122: Use filtration, centrifuging to remove contaminants | $17,520 | - | - | - | - |
$17,520
-
gal
|
- | |
TOTAL RECOMMENDED | $88,069 | $37,406 |
$8,224
100,234
kWh
|
$22,886
-
kW-mo/yr
|
$34,139
-
gal
|
$17,520
-
gal
|
$5,300 | ||
TOTAL IMPLEMENTED | $88,069 | $37,406 |
$8,224
100,234
kWh
|
$22,886
-
kW-mo/yr
|
$34,139
-
gal
|
$17,520
-
gal
|
$5,300 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs