| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0430 #07 Y:2011 | 07 | 2011 | Use cooling tower or economizer to replace chiller cooling | $30,360 | $161,900 | |
| NC0430 #06 Y:2011 | 06 | 2011 | Utilize higher efficiency lamps and/or ballasts | $1,385 | $4,833 | |
| NC0430 #05 Y:2011 | 05 | 2011 | Replace boiler | $3,539 | $11,800 | |
| NC0430 #04 Y:2011 | 04 | 2011 | Use cooling tower or economizer to replace chiller cooling | $11,250 | $22,950 | |
| NC0430 #03 Y:2011 | 03 | 2011 | Eliminate or reduce compressed air usage | $1,314 | $150 | |
| NC0430 #02 Y:2011 | 02 | 2011 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,052 | $100 | |
| NC0430 #01 Y:2011 | 01 | 2011 | Reduce the pressure of compressed air to the minimum required | $9,839 | - | |
| NC0252 #07 Y:2002 | 07 | 2002 | Meter recycled water (to reduce sewer charges) | $130 | $350 | |
| NC0252 #06 Y:2002 | 06 | 2002 | Avoid introducing hot, humid, or dirty air into hvac system | $780 | $1,000 | |
| NC0252 #05 Y:2002 | 05 | 2002 | Redesign process | $4,814 | $780 | |
| NC0252 #04 Y:2002 | 04 | 2002 | Chill water to the highest temperature possible | $1,917 | $400 | |
| NC0252 #03 Y:2002 | 03 | 2002 | Reduce illumination to minimum necessary levels | $240 | $100 | |
| NC0252 #02 Y:2002 | 02 | 2002 | Install outside air damper / economizer on hvac unit | $10,800 | $6,000 | |
| NC0252 #01 Y:2002 | 01 | 2002 | Eliminate or reduce compressed air usage | $14,411 | $20,000 | |
| NC0152 #09 Y:1998 | 09 | 1998 | Expand operations into unused space | $31,250 | $12,850 | |
| NC0152 #08 Y:1998 | 08 | 1998 | Replace city water with recycled water via cooling tower | $16,777 | $4,000 | |
| NC0152 #07 Y:1998 | 07 | 1998 | Increase amount of waste recovered for resale | $563 | $200 | |
| NC0152 #06 Y:1998 | 06 | 1998 | Reprocess spent oils on site for re-use | $3,010 | $5,000 | |
| NC0152 #05 Y:1998 | 05 | 1998 | Make a practice of turning off lights when not needed | $3,160 | - | |
| NC0152 #04 Y:1998 | 04 | 1998 | Reduce illumination to minimum necessary levels | $396 | $80 |