Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Current-carrying wiring devices
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0430 #07 Y:2011 Use cooling tower or economizer to replace chiller cooling $30,360 $161,900
NC0430 #06 Y:2011 Utilize higher efficiency lamps and/or ballasts $1,385 $4,833
NC0430 #05 Y:2011 Replace boiler $3,539 $11,800
NC0430 #04 Y:2011 Use cooling tower or economizer to replace chiller cooling $11,250 $22,950
NC0430 #03 Y:2011 Eliminate or reduce compressed air usage $1,314 $150
NC0430 #02 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $4,052 $100
NC0430 #01 Y:2011 Reduce the pressure of compressed air to the minimum required $9,839 -
NC0252 #07 Y:2002 Meter recycled water (to reduce sewer charges) $130 $350
NC0252 #06 Y:2002 Avoid introducing hot, humid, or dirty air into hvac system $780 $1,000
NC0252 #05 Y:2002 Redesign process $4,814 $780
NC0252 #04 Y:2002 Chill water to the highest temperature possible $1,917 $400
NC0252 #03 Y:2002 Reduce illumination to minimum necessary levels $240 $100
NC0252 #02 Y:2002 Install outside air damper / economizer on hvac unit $10,800 $6,000
NC0252 #01 Y:2002 Eliminate or reduce compressed air usage $14,411 $20,000
NC0152 #09 Y:1998 Expand operations into unused space $31,250 $12,850
NC0152 #08 Y:1998 Replace city water with recycled water via cooling tower $16,777 $4,000
NC0152 #07 Y:1998 Increase amount of waste recovered for resale $563 $200
NC0152 #06 Y:1998 Reprocess spent oils on site for re-use $3,010 $5,000
NC0152 #05 Y:1998 Make a practice of turning off lights when not needed $3,160 -
NC0152 #04 Y:1998 Reduce illumination to minimum necessary levels $396 $80