ITAC Assessment: NC0152
ITAC logo
ITAC Assessment: NC0152
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Electrical connectors
NAICS
n/a
SIC 3643: Current-Carrying Wiring Devices
Sales Range $10
M
to 50
M
# of Employees 187
Plant Area 132,600
ft2
Annual Production 7,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $240,402 7,374,267
kWh
Electricity Demand $178,718 15,886
kW-mo/yr
Electricity Fees $7,168 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,538 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,729

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.2437: Recover waste heat from equipment $4,388 $1,000 $4,388
131,301
kWh
- - - - - -
02 2.4323: Use optimum size and capacity equipment $3,988 $13,000 $3,988
119,578
kWh
- - - - - -
03 2.2514: Cover open tanks $1,006 $100 $601
17,878
kWh
$405
-
kW-mo/yr
- - - - -
04 2.7111: Reduce illumination to minimum necessary levels $396 $80 $234
7,034
kWh
$162
-
kW-mo/yr
- - - - -
05 2.7124: Make a practice of turning off lights when not needed $3,160 - $3,160
94,666
kWh
- - - - - -
06 3.5112: Reprocess spent oils on site for re-use $3,010 $5,000 - - - $550
-
gal
- $2,460 -
07 3.5313: Increase amount of waste recovered for resale $563 $200 - - - - $563
-
lb
- -
08 3.4114: Replace city water with recycled water via cooling tower $16,777 $4,000 $(-107.0)
(-3,224)
kWh
$(-216.0)
-
kW-mo/yr
$17,100
-
Tgal
- - - -
09 4.511: Expand operations into unused space $31,250 $12,850 - - - - - - $31,250
TOTAL RECOMMENDED $64,538 $36,230 $12,264
367,233
kWh
$351
-
kW-mo/yr
$17,100
-
Tgal
$550
-
gal
$563
-
lb
$2,460 $31,250
TOTAL IMPLEMENTED $4,729 $300 $3,761
112,544
kWh
$405
-
kW-mo/yr
- - $563
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs