Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Current-carrying wiring devices
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0638 #12 Y:2001 Utilize higher efficiency lamps and/or ballasts $128 $101
UD0638 #11 Y:2001 Install compressor air intakes in coolest locations $1,211 $250
UD0638 #10 Y:2001 Reschedule plant operations or reduce load to avoid peaks $1,751 -
UD0638 #09 Y:2001 Optimize plant power factor $1,935 $1,800
UD0638 #08 Y:2001 Utilize higher efficiency lamps and/or ballasts $2,144 $6,458
UD0638 #07 Y:2001 Recover waste heat from equipment $4,787 -
UD0638 #06 Y:2001 Install motor voltage controller on lightly loaded motors $5,079 $18,900
UD0638 #05 Y:2001 Use a less expensive method of waste removal $9,572 $21,682
UD0638 #04 Y:2001 Switch to a solvent that can be cleaned and re-used $18,300 $4,175
UD0638 #03 Y:2001 Make a new by-product $49,743 $30,000
UD0638 #02 Y:2001 Utilize higher efficiency lamps and/or ballasts $75,000 $17,017
UD0638 #01 Y:2001 Develop standard operating procedures $75,000 $10,000
UD0223 #03 Y:1986 Install set-back timers $809 $100
UD0223 #02 Y:1986 Reschedule plant operations or reduce load to avoid peaks $1,302 $131
UD0223 #01 Y:1986 Reschedule plant operations or reduce load to avoid peaks $6,084 -
UD0221 #06 Y:1986 Keep doors and windows shut when not on use $2,822 $2,070
UD0221 #05 Y:1986 Install timers and/or thermostats $7,926 $9,000
UD0221 #04 Y:1986 Minimize operation of equipment maintained in standby condition $7,322 $10,000
UD0221 #03 Y:1986 Recover waste heat from equipment $6,218 -
UD0221 #02 Y:1986 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $16,515 -