24
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Current-carrying wiring devices | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0638 #12 Y:2001 | 12 | 2001 | Utilize higher efficiency lamps and/or ballasts | $128 | $101 | |
| UD0638 #11 Y:2001 | 11 | 2001 | Install compressor air intakes in coolest locations | $1,211 | $250 | |
| UD0638 #10 Y:2001 | 10 | 2001 | Reschedule plant operations or reduce load to avoid peaks | $1,751 | - | |
| UD0638 #09 Y:2001 | 09 | 2001 | Optimize plant power factor | $1,935 | $1,800 | |
| UD0638 #08 Y:2001 | 08 | 2001 | Utilize higher efficiency lamps and/or ballasts | $2,144 | $6,458 | |
| UD0638 #07 Y:2001 | 07 | 2001 | Recover waste heat from equipment | $4,787 | - | |
| UD0638 #06 Y:2001 | 06 | 2001 | Install motor voltage controller on lightly loaded motors | $5,079 | $18,900 | |
| UD0638 #05 Y:2001 | 05 | 2001 | Use a less expensive method of waste removal | $9,572 | $21,682 | |
| UD0638 #04 Y:2001 | 04 | 2001 | Switch to a solvent that can be cleaned and re-used | $18,300 | $4,175 | |
| UD0638 #03 Y:2001 | 03 | 2001 | Make a new by-product | $49,743 | $30,000 | |
| UD0638 #02 Y:2001 | 02 | 2001 | Utilize higher efficiency lamps and/or ballasts | $75,000 | $17,017 | |
| UD0638 #01 Y:2001 | 01 | 2001 | Develop standard operating procedures | $75,000 | $10,000 | |
| UD0223 #03 Y:1986 | 03 | 1986 | Install set-back timers | $809 | $100 | |
| UD0223 #02 Y:1986 | 02 | 1986 | Reschedule plant operations or reduce load to avoid peaks | $1,302 | $131 | |
| UD0223 #01 Y:1986 | 01 | 1986 | Reschedule plant operations or reduce load to avoid peaks | $6,084 | - | |
| UD0221 #06 Y:1986 | 06 | 1986 | Keep doors and windows shut when not on use | $2,822 | $2,070 | |
| UD0221 #05 Y:1986 | 05 | 1986 | Install timers and/or thermostats | $7,926 | $9,000 | |
| UD0221 #04 Y:1986 | 04 | 1986 | Minimize operation of equipment maintained in standby condition | $7,322 | $10,000 | |
| UD0221 #03 Y:1986 | 03 | 1986 | Recover waste heat from equipment | $6,218 | - | |
| UD0221 #02 Y:1986 | 02 | 1986 | Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $16,515 | - |