ITAC Assessment: AS0580
ITAC logo
ITAC Assessment: AS0580
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Electrical cables
NAICS 335929: Other Communication and Energy Wire Manufacturing
SIC 3643: Current-Carrying Wiring Devices
Sales Range $50
M
to 100
M
# of Employees 270
Plant Area 65,000
ft2
Annual Production 170,000
units
Production Hrs. Annual 2,108
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,575 400,601
kWh
Electricity Fees $14,339 -
Natural Gas $5,352 434
MMBtu
Fuel Oil #1 $163,414 4,996
MMBtu
Waste Disposal Costs
Water Usage $12,513 1,880
Tgal
Water Disposal $5,086 1,045
Tgal
TOTAL YEARLY COSTS $263,279
RECOMMENDED SAVINGS* $34,448 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $21,593 $500 - $4,319 - - $17,274
02 2.6211: Conserve energy by efficient use of vending machines $4,414 $595 $4,414
28,292
kWh
- - - -
03 2.7132: Install timers on light switches in little used areas $3,401 $5,844 $3,401
21,800
kWh
- - - -
04 2.7226: Use computer programs to optimize hvac performance $2,126 $445 $1,976
12,669
kWh
- $150
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,594 $2,412 $1,493
9,572
kWh
- - $101 -
06 2.7135: Install occupancy sensors $803 $1,925 $803
5,141
kWh
- - - -
07 2.7229: Air condition only space necessary $517 $20 $517
3,311
kWh
- - - -
TOTAL RECOMMENDED $34,448 $11,741 $12,604
80,785
kWh
$4,319 $150
-
MMBtu
$101 $17,274
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs