55
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Relays and industrial controls | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| BD0410 #05 Y:2012 | 05 | 2012 | Use synthetic lubricant | $3,095 | $1,000 | |
| BD0410 #04 Y:2012 | 04 | 2012 | Use photocell controls | $4,755 | $4,050 | |
| BD0410 #03 Y:2012 | 03 | 2012 | Use waste heat from hot flue gases to preheat | $821 | $10,000 | |
| BD0410 #02 Y:2012 | 02 | 2012 | Reduce the pressure of compressed air to the minimum required | $11,850 | $20 | |
| BD0410 #01 Y:2012 | 01 | 2012 | Analyze flue gas for proper air/fuel ratio | $14,500 | $5,500 | |
| IC0175 #05 Y:2010 | 05 | 2010 | Conserve energy by efficient use of vending machines | $991 | - | |
| IC0175 #04 Y:2010 | 04 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $14,765 | $1,956 | |
| IC0175 #03 Y:2010 | 03 | 2010 | Replace heat treating oven with more efficient unit | $9,779 | $2,404 | |
| IC0175 #02 Y:2010 | 02 | 2010 | Utilize higher efficiency lamps and/or ballasts | $867 | $627 | |
| IC0175 #01 Y:2010 | 01 | 2010 | Analyze flue gas for proper air/fuel ratio | $5,695 | $76 | |
| WI0257 #05 Y:1995 | 05 | 1995 | Install spectral reflectors / delamp | $1,246 | - | |
| WI0257 #04 Y:1995 | 04 | 1995 | Eliminate or reduce compressed air usage | $2,323 | $3,075 | |
| WI0257 #03 Y:1995 | 03 | 1995 | Install equipment (eg compactor) to reduce disposal costs | $2,982 | $7,000 | |
| WI0257 #02 Y:1995 | 02 | 1995 | Reduce air conditioning load by evaporating water from roof | $5,468 | $15,000 | |
| WI0257 #01 Y:1995 | 01 | 1995 | Reschedule plant operations or reduce load to avoid peaks | $7,977 | - |