| Assessment Year | 2010 |
|---|---|
| Principal Product | electric motor control centers |
| NAICS | 335314: Relay and Industrial Control Manufacturing |
| SIC | 3625: Relays and Industrial Controls |
| Sales Range | $100 M to 500M |
| # of Employees | 300 |
| Plant Area |
170,000
ft2
|
| Annual Production | 6,073,500
pieces
|
| Production Hrs. Annual | 6,424
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $250,975 | 3,362,122 |
kWh
|
$0.075 |
| Electricity Demand | $50,115 | 691 |
kW-mo/yr
|
$72.53 |
| Natural Gas | $115,603 | 19,304 |
MMBtu
|
$5.99 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $32,097 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,695 | $76 | - | - |
$5,695
-
MMBtu
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $867 | $627 |
$456
6,086
kWh
|
$50
-
kW-mo/yr
|
- | $82 | $279 | |
| 03 | 2.2314: Replace heat treating oven with more efficient unit | $9,779 | $2,404 |
$(-3,371.0)
(-44,942)
kWh
|
$(-1,070.0)
-
kW-mo/yr
|
$14,220
-
MMBtu
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $14,765 | $1,956 |
$14,765
196,865
kWh
|
- | - | - | - | |
| 05 | 2.6211: Conserve energy by efficient use of vending machines | $991 | - |
$893
11,900
kWh
|
$98
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $32,097 | $5,063 |
$12,743
169,909
kWh
|
$(-922.0)
-
kW-mo/yr
|
$19,915
-
MMBtu
|
$82 | $279 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs