ITAC Assessment: UU0116
ITAC logo
ITAC Assessment: UU0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product centrifugation bowls and collection containers
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 100,000
ft2
Annual Production 32,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $230,531 5,711,710
kWh
Electricity Demand $147,589 11,275
kW-mo/yr
Electricity Fees $140,783 -
Natural Gas $14,077 1,900
MMBtu
Waste Disposal Costs
Water Usage $2,333 874
Tgal
TOTAL YEARLY COSTS $535,313
RECOMMENDED SAVINGS* $145,260 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $68,316

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Primary Raw Material Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $6,863 - $5,768
147,589
kWh
$801
-
kW-mo/yr
$293 -
02 2.2211: Use optimum temperature $6,759 - $4,329
110,995
kWh
$1,791
-
kW-mo/yr
$639 -
03 2.7314: Reduce ventilation air $61,065 - $37,588
963,783
kWh
$17,189
-
kW-mo/yr
$6,289 -
04 2.7447: Install vinyl strip / high speed / air curtain doors $4,620 $580 $2,362
60,820
kWh
$1,653
-
kW-mo/yr
$605 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,534 $2,402 $1,044
26,700
kWh
$476
-
kW-mo/yr
$15 -
06 2.7144: Install spectral reflectors / delamp $901 $142 $612
15,698
kWh
$280
-
kW-mo/yr
$9 -
07 3.5212: Regrind, reuse, or sell scrap plastic parts $4,500 $200 - - - $4,500
08 2.8121: Apply for tax-free status for energy purchases $59,018 $500 - - $59,018 -
TOTAL RECOMMENDED $145,260 $3,824 $51,703
1,325,585
kWh
$22,190
-
kW-mo/yr
$66,867 $4,500
TOTAL IMPLEMENTED $68,316 $3,044 $7,424
189,987
kWh
$1,557
-
kW-mo/yr
$59,334 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs