10
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Relays and industrial controls | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0558 #05 Y:1998 | 05 | 1998 | Use a less expensive method of waste removal | $1,200 | - | |
| UD0558 #04 Y:1998 | 04 | 1998 | Replace existing hvac unit with high efficiency model | $1,453 | $8,000 | |
| UD0558 #03 Y:1998 | 03 | 1998 | Use properly designed and sized hvac equipment | $7,068 | $7,600 | |
| UD0558 #02 Y:1998 | 02 | 1998 | Utilize higher efficiency lamps and/or ballasts | $11,343 | $45,360 | |
| UD0558 #01 Y:1998 | 01 | 1998 | Use / purchase optimum sized compressor | $18,790 | $8,000 | |
| UD0039 #05 Y:1982 | 05 | 1982 | Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $1,253 | $7,000 | |
| UD0039 #04 Y:1982 | 04 | 1982 | Convert combustion equipment to burn natural gas | $7,302 | $13,500 | |
| UD0039 #03 Y:1982 | 03 | 1982 | Install compressor air intakes in coolest locations | $357 | $300 | |
| UD0039 #02 Y:1982 | 02 | 1982 | Reduce hot water temperature to the minimum required | $480 | - | |
| UD0039 #01 Y:1982 | 01 | 1982 | Utilize higher efficiency lamps and/or ballasts | $5,698 | $1,557 |