ITAC Assessment: LS2410
ITAC logo
ITAC Assessment: LS2410
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Metal mill
NAICS 335314: Relay and Industrial Control Manufacturing
SIC 3625: Relays and Industrial Controls
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 448,542
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 2,938
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,153,120 9,314,880
kWh
Electricity Demand $717,117 81,091
kW-mo/yr
TOTAL YEARLY COSTS $1,870,237
RECOMMENDED SAVINGS* $145,459 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,967 $75 $1,967
15,865
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $34,951 $21,000 $34,951
281,862
kWh
-
03 2.4224: Upgrade controls on compressors $4,159 $12,500 $4,159
33,540
kWh
-
04 2.9114: Use solar heat to make electricty $104,382 $480,480 $50,307
405,702
kWh
$54,075
-
kW-mo/yr
TOTAL RECOMMENDED $145,459 $514,055 $91,384
736,969
kWh
$54,075
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs