| Assessment Year | 2024 |
|---|---|
| Principal Product | Relays, Sensors, Power Supplies |
| NAICS | 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing |
| SIC | 3625: Relays and Industrial Controls |
| Sales Range | $10 M to 50M |
| # of Employees | 158 |
| Plant Area |
73,420
ft2
|
| Annual Production | 1,133,352
units
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $54,329 | 554,373 |
kWh
|
$0.098 | |
| Electricity Demand | $30,134 | 2,009 |
kW-mo/yr
|
$15.00 | |
| Electricity Fees | $856 | - |
|
- | |
| Natural Gas | $10,114 | 1,039 |
MMBtu
|
$9.73 | |
| Waste Disposal Costs | |||||
| Water Usage | $5,546 | 675 |
Tgal
|
$8.22 | |
| TOTAL YEARLY COSTS | $100,979 | ||||
| RECOMMENDED SAVINGS* | $11,676 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6211: Conserve energy by efficient use of vending machines | $440 | - |
$363
3,707
kWh
|
$77
-
kW-mo/yr
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,473 | $71 |
$804
8,210
kWh
|
$669
-
kW-mo/yr
|
|
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $5,193 | $750 |
$3,101
31,641
kWh
|
$2,092
-
kW-mo/yr
|
|
| 04 | 2.7135: Install occupancy sensors | $97 | $93 |
$53
545
kWh
|
$44
-
kW-mo/yr
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,860 | $4,430 |
$1,560
15,930
kWh
|
$1,300
-
kW-mo/yr
|
|
| 06 | 2.2437: Recover waste heat from equipment | $1,614 | $2,164 |
$1,614
16,443
kWh
|
- | |
| TOTAL RECOMMENDED | $11,676 | $7,508 |
$7,495
76,476
kWh
|
$4,181
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs