ITAC Assessment: AM0417
ITAC logo
ITAC Assessment: AM0417
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Corrugated Boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 175,000
ft2
Annual Production 660,000
thousand feet
Production Hrs. Annual 6,096
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $291,780 4,713,427
kWh
Electricity Demand $82,952 13,230
kW-mo/yr
Natural Gas $201,584 33,596
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $199,860 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $199,480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $120,900 $8,000 - - - - $120,900
02 2.3212: Optimize plant power factor $32,450 $24,980 - $32,450
-
kW-mo/yr
- - -
03 2.2135: Repair and eliminate steam leaks $32,210 $4,900 - - $32,210
-
MMBtu
- -
04 2.2511: Insulate bare equipment $7,230 $1,330 - - $7,230
-
MMBtu
- -
05 2.2113: Repair or replace steam traps $3,480 $450 - - $3,480
-
MMBtu
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,670 $880 $1,670
38,830
kWh
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,100 $780 $315
7,320
kWh
$120
-
kW-mo/yr
- $665 -
08 2.6212: Turn off equipment during breaks, reduce operating time $440 - $440
10,230
kWh
- - - -
09 2.7124: Make a practice of turning off lights when not needed $380 - $330
7,630
kWh
$50
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $199,860 $41,320 $2,755
64,010
kWh
$32,620
-
kW-mo/yr
$42,920
-
MMBtu
$665 $120,900
TOTAL IMPLEMENTED $199,480 $41,320 $2,425
56,380
kWh
$32,570
-
kW-mo/yr
$42,920
-
MMBtu
$665 $120,900
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs