Assessment Year | 2002 |
---|---|
Principal Product | Corrugated Boxes |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
175,000
ft2
|
Annual Production | 660,000
thousand feet
|
Production Hrs. Annual | 6,096
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $291,780 | 4,713,427 |
kWh
|
$0.062 |
Electricity Demand | $82,952 | 13,230 |
kW-mo/yr
|
$6.27 |
Natural Gas | $201,584 | 33,596 |
MMBtu
|
$6.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $199,860 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $199,480 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $120,900 | $8,000 | - | - | - | - | $120,900 | |
02 | 2.3212: Optimize plant power factor | $32,450 | $24,980 | - |
$32,450
-
kW-mo/yr
|
- | - | - | |
03 | 2.2135: Repair and eliminate steam leaks | $32,210 | $4,900 | - | - |
$32,210
-
MMBtu
|
- | - | |
04 | 2.2511: Insulate bare equipment | $7,230 | $1,330 | - | - |
$7,230
-
MMBtu
|
- | - | |
05 | 2.2113: Repair or replace steam traps | $3,480 | $450 | - | - |
$3,480
-
MMBtu
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,670 | $880 |
$1,670
38,830
kWh
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,100 | $780 |
$315
7,320
kWh
|
$120
-
kW-mo/yr
|
- | $665 | - | |
08 | 2.6212: Turn off equipment during breaks, reduce operating time | $440 | - |
$440
10,230
kWh
|
- | - | - | - | |
09 | 2.7124: Make a practice of turning off lights when not needed | $380 | - |
$330
7,630
kWh
|
$50
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $199,860 | $41,320 |
$2,755
64,010
kWh
|
$32,620
-
kW-mo/yr
|
$42,920
-
MMBtu
|
$665 | $120,900 | ||
TOTAL IMPLEMENTED | $199,480 | $41,320 |
$2,425
56,380
kWh
|
$32,570
-
kW-mo/yr
|
$42,920
-
MMBtu
|
$665 | $120,900 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs