Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Motors and generators
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0521 #07 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $1,254 $800
SU0521 #06 Y:2022 Utilize higher efficiency lamps and/or ballasts $99 $47
SU0521 #05 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $2,226 $380
SU0521 #04 Y:2022 Eliminate or reduce compressed air usage $6,111 -
SU0521 #03 Y:2022 Apply for tax-free status for energy purchases $40 -
SU0521 #02 Y:2022 Apply for tax-free status for energy purchases $2,565 -
SU0521 #01 Y:2022 Reschedule plant operations or reduce load to avoid peaks $2,147 -
SU0286 #10 Y:2009 Install occupancy sensors $102 $664
SU0286 #09 Y:2009 Utilize higher efficiency lamps and/or ballasts $318 $337
SU0286 #08 Y:2009 Conserve energy by efficient use of vending machines $400 $457
SU0286 #07 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $2,080 $287
SU0286 #06 Y:2009 Disconnect ballasts $1,462 -
SU0286 #05 Y:2009 Change rate schedules or other changes in utility service $3,974 -
SU0286 #04 Y:2009 Use or replace with energy efficient substitutes $4,215 -
SU0286 #03 Y:2009 Utilize controls to operate equipment only when needed $4,389 -
SU0286 #02 Y:2009 Change rate schedules or other changes in utility service $8,876 -
SU0286 #01 Y:2009 Reduce the pressure of compressed air to the minimum required $11,756 -
SU0172 #08 Y:2003 Recover waste heat from equipment $1,950 $4,508
SU0172 #07 Y:2003 Add equipment/ operators to reduce production bottleneck $31,815 $30,250
SU0172 #06 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $2,140 $400