| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SU0521 #07 Y:2022 | 07 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $1,254 | $800 | |
| SU0521 #06 Y:2022 | 06 | 2022 | Utilize higher efficiency lamps and/or ballasts | $99 | $47 | |
| SU0521 #05 Y:2022 | 05 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,226 | $380 | |
| SU0521 #04 Y:2022 | 04 | 2022 | Eliminate or reduce compressed air usage | $6,111 | - | |
| SU0521 #03 Y:2022 | 03 | 2022 | Apply for tax-free status for energy purchases | $40 | - | |
| SU0521 #02 Y:2022 | 02 | 2022 | Apply for tax-free status for energy purchases | $2,565 | - | |
| SU0521 #01 Y:2022 | 01 | 2022 | Reschedule plant operations or reduce load to avoid peaks | $2,147 | - | |
| SU0286 #10 Y:2009 | 10 | 2009 | Install occupancy sensors | $102 | $664 | |
| SU0286 #09 Y:2009 | 09 | 2009 | Utilize higher efficiency lamps and/or ballasts | $318 | $337 | |
| SU0286 #08 Y:2009 | 08 | 2009 | Conserve energy by efficient use of vending machines | $400 | $457 | |
| SU0286 #07 Y:2009 | 07 | 2009 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,080 | $287 | |
| SU0286 #06 Y:2009 | 06 | 2009 | Disconnect ballasts | $1,462 | - | |
| SU0286 #05 Y:2009 | 05 | 2009 | Change rate schedules or other changes in utility service | $3,974 | - | |
| SU0286 #04 Y:2009 | 04 | 2009 | Use or replace with energy efficient substitutes | $4,215 | - | |
| SU0286 #03 Y:2009 | 03 | 2009 | Utilize controls to operate equipment only when needed | $4,389 | - | |
| SU0286 #02 Y:2009 | 02 | 2009 | Change rate schedules or other changes in utility service | $8,876 | - | |
| SU0286 #01 Y:2009 | 01 | 2009 | Reduce the pressure of compressed air to the minimum required | $11,756 | - | |
| SU0172 #08 Y:2003 | 08 | 2003 | Recover waste heat from equipment | $1,950 | $4,508 | |
| SU0172 #07 Y:2003 | 07 | 2003 | Add equipment/ operators to reduce production bottleneck | $31,815 | $30,250 | |
| SU0172 #06 Y:2003 | 06 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,140 | $400 |