ITAC Assessment: SU0172
ITAC logo
ITAC Assessment: SU0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product motors
NAICS 335312: Motor and Generator Manufacturing
SIC 3621: Motors and Generators
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area 68,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,791 801,159
kWh
Electricity Demand $49,753 3,591
kW-mo/yr
Natural Gas $79,522 69,812
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,054 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,289

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 4.311: Schedule deliveries according to demand $4,883 - - - - - $4,883
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,000 - $1,066
12,600
kWh
$934
-
kW-mo/yr
- - -
03 2.6218: Turn off equipment when not in use $515 - $421
4,980
kWh
$94
-
kW-mo/yr
- - -
04 4.821: Pay bills on time to avoid late fees $325 - - - $325 - -
05 2.4221: Install compressor air intakes in coolest locations $1,426 $120 $761
9,000
kWh
$665
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,140 $400 $1,142
13,500
kWh
$998
-
kW-mo/yr
- - -
07 4.111: Add equipment/ operators to reduce production bottleneck $31,815 $30,250 - - - - $31,815
08 2.2437: Recover waste heat from equipment $1,950 $4,508 - - - $1,950
-
MMBtu
-
TOTAL RECOMMENDED $45,054 $35,278 $3,390
40,080
kWh
$2,691
-
kW-mo/yr
$325 $1,950
-
MMBtu
$36,698
TOTAL IMPLEMENTED $9,289 $520 $2,324
27,480
kWh
$1,757
-
kW-mo/yr
$325 - $4,883
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs