ITAC Assessment: TN0387
ITAC logo
ITAC Assessment: TN0387
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product DENIM JEANS
NAICS
n/a
SIC 2325: Men's and Boys' Separate Trousers and Slacks
Sales Range $1
M
to 5
M
# of Employees 96
Plant Area
n/a
Annual Production 500,000
pieces
Production Hrs. Annual 2,091
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,131 436,108
kWh
LPG $13,486 2,565
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,693 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,680

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $3,103 $1,400 $1,584
31,067
kWh
$1,519
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,855 $390 $2,855
55,979
kWh
- -
03 2.2135: Repair and eliminate steam leaks $570 $285 - $570
-
MMBtu
-
04 2.7123: Keep lamps and reflectors clean $1,013 $5,564 $867
16,999
kWh
- $146
05 2.2136: Install / repair insulation on steam lines $385 $131 - $385
-
MMBtu
-
06 2.2511: Insulate bare equipment $128 $141 - $128
-
MMBtu
-
07 2.6232: Install set-back timers $359 - $359
7,034
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $190 $180 $190
3,810
kWh
- -
09 2.4231: Reduce the pressure of compressed air to the minimum required $75 - $75
1,465
kWh
- -
10 2.6212: Turn off equipment during breaks, reduce operating time $15 - - $15
-
MMBtu
-
TOTAL RECOMMENDED $8,693 $8,091 $5,930
116,354
kWh
$2,617
-
MMBtu
$146
TOTAL IMPLEMENTED $7,680 $2,527 $5,063
99,355
kWh
$2,617
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs