ITAC Assessment: SU0521
ITAC logo
ITAC Assessment: SU0521
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Plastic automotive ignition parts
NAICS 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 3621: Motors and Generators
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 20,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 2,210
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,529 761,475
kWh
Electricity Demand $42,903 3,818
kW-mo/yr
Electricity Fees $5,192 -
Natural Gas $9,864 2,023
MMBtu
Waste Disposal Costs
Water Usage $1,136 1
Tgal
Solid Waste (non-haz) $7,887 28,480
lb
TOTAL YEARLY COSTS $107,513
RECOMMENDED SAVINGS* $14,441 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,342

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,147 - - $2,147
-
kW-mo/yr
- -
02 2.8121: Apply for tax-free status for energy purchases $2,565 - - - - $2,565
03 2.8121: Apply for tax-free status for energy purchases $40 - - - - $40
04 2.4239: Eliminate or reduce compressed air usage $6,111 - $6,111
115,307
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,226 $380 $2,226
41,992
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $99 $47 $56
1,051
kWh
$16
-
kW-mo/yr
$9 $18
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,254 $800 $1,254
23,652
kWh
- - -
TOTAL RECOMMENDED $14,441 $1,227 $9,646
182,002
kWh
$2,163
-
kW-mo/yr
$9 $2,623
TOTAL IMPLEMENTED $14,342 $1,180 $9,590
180,951
kWh
$2,147
-
kW-mo/yr
- $2,605
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs