ITAC Assessment: DS0019
ITAC logo
ITAC Assessment: DS0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Pizza Products
NAICS
n/a
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 76,000
ft2
Annual Production 0
units
Production Hrs. Annual 5,200
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $254,131 4,836,460
kWh
Natural Gas $42,063 9,391
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,919 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,182 $9,776 $5,182
94,666
kWh
02 2.7135: Install occupancy sensors $443 $100 $443
12,896
kWh
03 2.7122: Disconnect ballasts $922 $90 $922
19,050
kWh
04 2.4133: Use most efficient type of electric motors $4,172 $11,346 $4,172
77,667
kWh
05 2.3212: Optimize plant power factor $7,900 $28,300 $7,900
-
kWh
06 2.3192: Use fossil fuel powered generator during peak demand periods $55,126 $259,000 $55,126
-
kWh
07 2.4221: Install compressor air intakes in coolest locations $174 $240 $174
4,982
kWh
TOTAL RECOMMENDED $73,919 $308,852 $73,919
209,261
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs