ITAC Assessment: SU0286
ITAC logo
ITAC Assessment: SU0286
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Electric Motors
NAICS 335312: Motor and Generator Manufacturing
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 75,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,840 991,872
kWh
Electricity Demand $61,379 3,686
kW-mo/yr
Electricity Fees $5,798 -
Natural Gas $44,670 3,807
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,572 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,051

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $11,756 - $5,828
55,500
kWh
$5,928
-
kW-mo/yr
-
02 2.8114: Change rate schedules or other changes in utility service $8,876 - - - $8,876
03 2.6231: Utilize controls to operate equipment only when needed $4,389 - $4,389
41,800
kWh
- -
04 2.4322: Use or replace with energy efficient substitutes $4,215 - $2,117
20,160
kWh
$2,098
-
kW-mo/yr
-
05 2.8114: Change rate schedules or other changes in utility service $3,974 - - - $3,974
06 2.7122: Disconnect ballasts $1,462 - $1,196
11,388
kWh
$266
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,080 $287 $1,181
11,250
kWh
$899
-
kW-mo/yr
-
08 2.6211: Conserve energy by efficient use of vending machines $400 $457 $400
3,805
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $318 $337 $138
1,314
kWh
$33
-
kW-mo/yr
$147
10 2.7135: Install occupancy sensors $102 $664 $102
972
kWh
- -
TOTAL RECOMMENDED $37,572 $1,745 $15,351
146,189
kWh
$9,224
-
kW-mo/yr
$12,997
TOTAL IMPLEMENTED $18,051 $287 $9,126
86,910
kWh
$8,925
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs