| Assessment Year | 2000 |
|---|---|
| Principal Product | Secondary Machining |
| NAICS |
n/a
|
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 83 |
| Plant Area |
98,500
ft2
|
| Annual Production | 2,150,000
pieces
|
| Production Hrs. Annual | 3,625
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $42,971 | 1,213,072 |
kWh
|
$0.035 |
| Electricity Demand | $51,911 | 4,164 |
kW-mo/yr
|
$12.47 |
| Electricity Fees | $4,293 | - |
|
- |
| Natural Gas | $20,409 | 5,628 |
MMBtu
|
$3.63 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $25,956 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,033 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7251: Reduce air conditioning load by evaporating water from roof | $10,973 | $29,550 |
$5,540
150,938
kWh
|
$6,094
-
kW-mo/yr
|
- |
$(-661.0)
-
Tgal
|
- | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,183 | $4,000 |
$1,991
54,220
kWh
|
$2,192
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.7261: Install timers and/or thermostats | $3,541 | - | - | - |
$3,541
-
MMBtu
|
- | - | |
| 04 | 2.1123: Install automatic stack damper | $1,157 | $1,000 | - | - |
$1,157
-
MMBtu
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,869 | $8,223 |
$871
23,740
kWh
|
$998
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.7135: Install occupancy sensors | $242 | $300 |
$242
6,741
kWh
|
- | - | - | - | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $1,293 | $840 |
$484
13,189
kWh
|
$809
-
kW-mo/yr
|
- | - | - | |
| 08 | 2.2437: Recover waste heat from equipment | $1,028 | $1,300 | - | - |
$1,028
-
MMBtu
|
- | - | |
| 09 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $945 | - | - | - | - | - |
$945
-
lb
|
|
| 10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $417 | $687 |
$92
2,638
kWh
|
$325
-
kW-mo/yr
|
- | - | - | |
| 11 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $184 | - |
$114
3,224
kWh
|
$70
-
kW-mo/yr
|
- | - | - | |
| 12 | 2.3132: Recharge batteries on during off-peak demand periods | $124 | $300 | - |
$124
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $25,956 | $46,200 |
$9,334
254,690
kWh
|
$10,612
-
kW-mo/yr
|
$5,726
-
MMBtu
|
$(-661.0)
-
Tgal
|
$945
-
lb
|
||
| TOTAL IMPLEMENTED | $10,033 | $6,600 |
$1,991
54,220
kWh
|
$2,316
-
kW-mo/yr
|
$5,726
-
MMBtu
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs