Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,867

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electronic and other electrical equipment and components, except computer equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2513 #06 Y:2025 Install occupancy sensors $602 $2,234
UL2513 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,723 $561
UL2513 #04 Y:2025 Use solar heat to make electricty $57,929 $431,966
UL2513 #03 Y:2025 Use outside cold water source as a supply of cooling water $34,574 $58,425
UL2513 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,535 $1,080
UL2513 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $1,366 -
NT0051 #06 Y:2025 Lower temperature during the winter season and vice-versa $586 -
NT0051 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,986 $5,609
NT0051 #04 Y:2025 Optimize plant power factor $2,603 $6,709
NT0051 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $12,814 -
NT0051 #02 Y:2025 Replace existing hvac unit with high efficiency model $32,918 $193,830
NT0051 #01 Y:2025 Reduce scrap production $98,944 $80,000
DL0261 #06 Y:2025 Use optimum size and capacity equipment $4,283 $1,200
DL0261 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $14,186 $16,400
DL0261 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $15,337 $90,000
DL0261 #03 Y:2025 Change procedures / equipment / operating conditions $9,021 $7,950
DL0261 #02 Y:2025 Utilize controls to operate equipment only when needed $4,374 -
DL0261 #01 Y:2025 Turn off equipment when not in use $5,489 $720
MS0452 #03 Y:2025 Condense operation into one building $26,400 $60,000
MS0452 #02 Y:2025 Use / purchase optimum sized compressor $2,035 $20,549