Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electronic and other electrical equipment and components, except computer equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AR0190 #04 Y:2000 Re-arrange equipment layout to reduce handling costs $249,600 $6,949
AR0190 #03 Y:2000 Optimize plant power factor $1,150 $1,950
AR0190 #02 Y:2000 Reduce the pressure of compressed air to the minimum required $551 -
AR0190 #01 Y:2000 Install compressor air intakes in coolest locations $235 $75
AR0170 #04 Y:1999 Improve space comfort conditioning $6,120 $1,916
AR0170 #03 Y:1999 Develop standard procedures to improve internal yields $113,600 $4,700
AR0170 #02 Y:1999 Install occupancy sensors $84 $60
AR0170 #01 Y:1999 Utilize higher efficiency lamps and/or ballasts $2,421 $6,020
AR0125 #10 Y:1997 Re-arrange equipment layout to reduce labor costs $4,700 $1,000
AR0125 #09 Y:1997 Re-arrange equipment layout to reduce labor costs $31,334 $2,000
AR0125 #08 Y:1997 Recover and reuse cooling water $4,837 $31,000
AR0125 #07 Y:1997 Recover and reuse cooling water $6,309 $8,400
AR0125 #06 Y:1997 Overlap custodial services with normal day hours $89 -
AR0125 #05 Y:1997 Eliminate leaks in inert gas and compressed air lines/ valves $1,152 $150
AR0125 #04 Y:1997 Utilize energy-efficient belts and other improved mechanisms $265 -
AR0125 #03 Y:1997 Use most efficient type of electric motors $200 $229
AR0125 #02 Y:1997 Reduce illumination to minimum necessary levels $1,085 $186
AR0125 #01 Y:1997 Utilize higher efficiency lamps and/or ballasts $6,053 $1,212
AR0108 #10 Y:1996 Replace old machine with new automatic multi-station tool $113,100 $30,000
AR0108 #09 Y:1996 Recover and reuse waste material $2,070 $1,000