Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electronic and other electrical equipment and components, except computer equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DS0172 #07 Y:2000 Install shelves / racks to utilize unused space $4,500 $17,260
DS0172 #06 Y:2000 Install equipment to move product $1,287 $450
DS0172 #05 Y:2000 Lease / purchase baler; sell cardboard to recycler $1,262 $4,230
DS0172 #04 Y:2000 Recover waste heat from equipment $721 $1,770
DS0172 #03 Y:2000 Turn off equipment when not in use $1,033 $2,718
DS0172 #02 Y:2000 Install occupancy sensors $569 $864
DS0172 #01 Y:2000 Utilize higher efficiency lamps and/or ballasts $7,907 $8,927
DS0158 #06 Y:1999 Begin a practice of predictive / preventative maintenance $817 -
DS0158 #05 Y:1999 Lease / purchase baler; sell cardboard to recycler $1,244 $4,230
DS0158 #04 Y:1999 Distill contaminated solvents for reuse $(-2,948.0) $3,295
DS0158 #03 Y:1999 Use power during off-peak periods $1,067 $900
DS0158 #02 Y:1999 Install timers and/or thermostats $763 $1,113
DS0158 #01 Y:1999 Install occupancy sensors $6,312 $2,897
DS0138 #07 Y:1999 Increase use of automation $96,760 $65,000
DS0138 #06 Y:1999 Begin a practice of predictive / preventative maintenance $1,688 -
DS0138 #05 Y:1999 Upgrade controls on compressors $1,165 $241
DS0138 #04 Y:1999 Meter recycled water (to reduce sewer charges) $1,273 $400
DS0138 #03 Y:1999 Install compressor air intakes in coolest locations $629 $875
DS0138 #02 Y:1999 Insulate bare equipment $242 $110
DS0138 #01 Y:1999 Eliminate leaks in inert gas and compressed air lines/ valves $3,384 $998