75
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| AR0190 #04 Y:2000 | 04 | 2000 | Re-arrange equipment layout to reduce handling costs | $249,600 | $6,949 | |
| AR0190 #03 Y:2000 | 03 | 2000 | Optimize plant power factor | $1,150 | $1,950 | |
| AR0190 #02 Y:2000 | 02 | 2000 | Reduce the pressure of compressed air to the minimum required | $551 | - | |
| AR0190 #01 Y:2000 | 01 | 2000 | Install compressor air intakes in coolest locations | $235 | $75 | |
| AR0170 #04 Y:1999 | 04 | 1999 | Improve space comfort conditioning | $6,120 | $1,916 | |
| AR0170 #03 Y:1999 | 03 | 1999 | Develop standard procedures to improve internal yields | $113,600 | $4,700 | |
| AR0170 #02 Y:1999 | 02 | 1999 | Install occupancy sensors | $84 | $60 | |
| AR0170 #01 Y:1999 | 01 | 1999 | Utilize higher efficiency lamps and/or ballasts | $2,421 | $6,020 | |
| AR0125 #10 Y:1997 | 10 | 1997 | Re-arrange equipment layout to reduce labor costs | $4,700 | $1,000 | |
| AR0125 #09 Y:1997 | 09 | 1997 | Re-arrange equipment layout to reduce labor costs | $31,334 | $2,000 | |
| AR0125 #08 Y:1997 | 08 | 1997 | Recover and reuse cooling water | $4,837 | $31,000 | |
| AR0125 #07 Y:1997 | 07 | 1997 | Recover and reuse cooling water | $6,309 | $8,400 | |
| AR0125 #06 Y:1997 | 06 | 1997 | Overlap custodial services with normal day hours | $89 | - | |
| AR0125 #05 Y:1997 | 05 | 1997 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,152 | $150 | |
| AR0125 #04 Y:1997 | 04 | 1997 | Utilize energy-efficient belts and other improved mechanisms | $265 | - | |
| AR0125 #03 Y:1997 | 03 | 1997 | Use most efficient type of electric motors | $200 | $229 | |
| AR0125 #02 Y:1997 | 02 | 1997 | Reduce illumination to minimum necessary levels | $1,085 | $186 | |
| AR0125 #01 Y:1997 | 01 | 1997 | Utilize higher efficiency lamps and/or ballasts | $6,053 | $1,212 | |
| AR0108 #10 Y:1996 | 10 | 1996 | Replace old machine with new automatic multi-station tool | $113,100 | $30,000 | |
| AR0108 #09 Y:1996 | 09 | 1996 | Recover and reuse waste material | $2,070 | $1,000 |