Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,832

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electronic and other electrical equipment and components, except computer equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1152 #09 Y:2025 Reschedule plant operations or reduce load to avoid peaks $6,238 -
OK1152 #08 Y:2025 Utilize higher efficiency lamps and/or ballasts $9,737 $16,196
OK1152 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $3,701 $9,073
OK1152 #06 Y:2025 Use solar heat to make electricty $24,453 $208,600
OK1152 #05 Y:2025 Replace existing hvac unit with high efficiency model $2,424 $13,000
OK1152 #04 Y:2025 Install outside air damper / economizer on hvac unit $4,489 $20,639
OK1152 #03 Y:2025 Install compressor air intakes in coolest locations $1,965 -
OK1152 #02 Y:2025 Recover waste heat from equipment $5,879 $2,304
OK1152 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $1,801 -
NL0111 #06 Y:2025 Apply for tax-free status for energy purchases $471 $416
NL0111 #05 Y:2025 Meter waste water $564 $1,582
NL0111 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $771 $26
NL0111 #03 Y:2025 Reschedule plant operations or reduce load to avoid peaks $2,457 $104
NL0111 #02 Y:2025 Install efficient rectifiers $9,857 $75,000
NL0111 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $20,339 $29,931
UC2509 #09 Y:2025 Utilize controls to operate equipment only when needed $13,478 $50
UC2509 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $29,692 $9,100
UC2509 #07 Y:2025 Insulate bare equipment $8,347 $2,798
UC2509 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,269 $1,190
UC2509 #05 Y:2025 Replace boiler $42,258 $132,297