Assessment Year | 2025 |
---|---|
Principal Product | Electrical & machined aircraft parts |
NAICS | 332710: Machine Shops |
SIC | 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere |
Sales Range | $10 M to 50M |
# of Employees | 88 |
Plant Area |
96,000
ft2
|
Annual Production | 388,961
pieces
|
Production Hrs. Annual | 2,415
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $90,362 | 2,259,067 |
kWh
|
$0.040 | |
Electricity Demand | $124,908 | 5,286 |
kW-mo/yr
|
$23.63 | |
Electricity Fees | $17,661 | - |
|
- | |
Natural Gas | $12,600 | 1,054 |
MMBtu
|
$11.95 | |
Waste Disposal Costs | |||||
Water Usage | $2,373 | 368 |
Tgal
|
$6.45 | |
Water Disposal | $2,112 | 368 |
Tgal
|
$5.74 | |
TOTAL YEARLY COSTS | $250,016 | ||||
RECOMMENDED SAVINGS* | $60,687 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,801 | - |
$1,801
45,026
kWh
|
- | - | |
02 | 2.2437: Recover waste heat from equipment | $5,879 | $2,304 | - | - |
$5,879
-
MMBtu
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $1,965 | - |
$1,965
49,126
kWh
|
- | - | |
04 | 2.7241: Install outside air damper / economizer on hvac unit | $4,489 | $20,639 |
$4,489
112,219
kWh
|
- | - | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $2,424 | $13,000 |
$2,424
60,590
kWh
|
- | - | |
06 | 2.9114: Use solar heat to make electricty | $24,453 | $208,600 |
$24,453
611,328
kWh
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,701 | $9,073 |
$3,701
92,528
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,737 | $16,196 |
$5,933
148,325
kWh
|
$3,804
-
kW-mo/yr
|
- | |
09 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $6,238 | - | - |
$6,238
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $60,687 | $269,812 |
$44,766
1,119,142
kWh
|
$10,042
-
kW-mo/yr
|
$5,879
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs