ITAC Assessment: OK1152
ITAC logo
ITAC Assessment: OK1152
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Electrical & machined aircraft parts
NAICS 332710: Machine Shops
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 88
Plant Area 96,000
ft2
Annual Production 388,961
pieces
Production Hrs. Annual 2,415
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,362 2,259,067
kWh
Electricity Demand $124,908 5,286
kW-mo/yr
Electricity Fees $17,661 -
Natural Gas $12,600 1,054
MMBtu
Waste Disposal Costs
Water Usage $2,373 368
Tgal
Water Disposal $2,112 368
Tgal
TOTAL YEARLY COSTS $250,016
RECOMMENDED SAVINGS* $60,687 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,801 - $1,801
45,026
kWh
- -
02 2.2437: Recover waste heat from equipment $5,879 $2,304 - - $5,879
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $1,965 - $1,965
49,126
kWh
- -
04 2.7241: Install outside air damper / economizer on hvac unit $4,489 $20,639 $4,489
112,219
kWh
- -
05 2.7232: Replace existing hvac unit with high efficiency model $2,424 $13,000 $2,424
60,590
kWh
- -
06 2.9114: Use solar heat to make electricty $24,453 $208,600 $24,453
611,328
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,701 $9,073 $3,701
92,528
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $9,737 $16,196 $5,933
148,325
kWh
$3,804
-
kW-mo/yr
-
09 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,238 - - $6,238
-
kW-mo/yr
-
TOTAL RECOMMENDED $60,687 $269,812 $44,766
1,119,142
kWh
$10,042
-
kW-mo/yr
$5,879
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs