Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

130

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Industrial and commercial machinery and equipment, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TA0102 #02 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $1,027 $110
TA0102 #01 Y:2005 Use power during off-peak periods $20,445 -
AM0489 #05 Y:2005 Use adjustable frequency drive or multiple speed motors on existing system $1,700 $500
AM0489 #04 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $1,760 $1,000
AM0489 #03 Y:2005 Add equipment/ operators to reduce production bottleneck $2,500 $5,200
AM0489 #02 Y:2005 Utilize daylight whenever possible in lieu of artificial light $4,140 -
AM0489 #01 Y:2005 Modify current incentive program $6,000 $6,000
AM0441 #11 Y:2003 Reduce the pressure of compressed air to the minimum required $210 $17
AM0441 #10 Y:2003 Use synthetic lubricant $373 -
AM0441 #09 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $510 $250
AM0441 #08 Y:2003 Reduce the pressure of compressed air to the minimum required $560 $17
AM0441 #07 Y:2003 Reuse rags until completely soiled $1,460 -
AM0441 #06 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $1,490 $500
AM0441 #05 Y:2003 Make a practice of turning off lights when not needed $2,180 -
AM0441 #04 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $2,330 $300
AM0441 #03 Y:2003 Use a less expensive method of waste removal $3,320 $699
AM0441 #02 Y:2003 Utilize daylight whenever possible in lieu of artificial light $4,585 -
AM0441 #01 Y:2003 Eliminate or reduce compressed air usage $5,700 $410
TA0010 #10 Y:2001 Make a practice of turning off lights when not needed $520 -
TA0010 #09 Y:2001 Utilize higher efficiency lamps and/or ballasts $755 $984