ITAC Assessment: AM0489
ITAC logo
ITAC Assessment: AM0489
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Car Shredders, Hyperbaric chambers, Large Ductwork
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 82
Plant Area 102,400
ft2
Annual Production 11
pieces
Production Hrs. Annual 5,700
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,247 2,654,208
kWh
Electricity Demand $47,903 8,600
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,100 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,400

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings Primary Product Savings
01 4.421: Modify current incentive program $6,000 $6,000 - - - $6,000
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $4,140 - $4,140
100,000
kWh
- - -
03 4.111: Add equipment/ operators to reduce production bottleneck $2,500 $5,200 - - $2,500 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,760 $1,000 $1,760
42,600
kWh
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,700 $500 $1,370
33,100
kWh
$330
-
kW-mo/yr
- -
TOTAL RECOMMENDED $16,100 $12,700 $7,270
175,700
kWh
$330
-
kW-mo/yr
$2,500 $6,000
TOTAL IMPLEMENTED $8,400 $6,200 $5,900
142,600
kWh
- $2,500 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs