| Assessment Year | 2005 |
|---|---|
| Principal Product | Car Shredders, Hyperbaric chambers, Large Ductwork |
| NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 82 |
| Plant Area |
102,400
ft2
|
| Annual Production | 11
pieces
|
| Production Hrs. Annual | 5,700
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $114,247 | 2,654,208 |
kWh
|
$0.043 |
| Electricity Demand | $47,903 | 8,600 |
kW-mo/yr
|
$5.57 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $16,100 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,400 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.421: Modify current incentive program | $6,000 | $6,000 | - | - | - | $6,000 | |
| 02 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $4,140 | - |
$4,140
100,000
kWh
|
- | - | - | |
| 03 | 4.111: Add equipment/ operators to reduce production bottleneck | $2,500 | $5,200 | - | - | $2,500 | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,760 | $1,000 |
$1,760
42,600
kWh
|
- | - | - | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,700 | $500 |
$1,370
33,100
kWh
|
$330
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $16,100 | $12,700 |
$7,270
175,700
kWh
|
$330
-
kW-mo/yr
|
$2,500 | $6,000 | ||
| TOTAL IMPLEMENTED | $8,400 | $6,200 |
$5,900
142,600
kWh
|
- | $2,500 | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs