Assessment Year | 2016 |
---|---|
Principal Product | Precast concrete products |
NAICS | 327320: Ready-Mix Concrete Manufacturing |
SIC | 3273: Ready-Mixed Concrete |
Sales Range | $10 M to 50M |
# of Employees | 74 |
Plant Area |
18,400
ft2
|
Annual Production | 40,000
pieces
|
Production Hrs. Annual | 3,640
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $53,185 | 413,886 |
kWh
|
$0.13 |
Electricity Demand | $17,450 | 1,426 |
kW-mo/yr
|
$12.24 |
Electricity Fees | $3,270 | - |
|
- |
LPG | $4,826 | 260 |
MMBtu
|
$18.56 |
Fuel Oil #2 | $41,459 | 3,185 |
MMBtu
|
$13.02 |
TOTAL YEARLY COSTS | $120,190 | |||
RECOMMENDED SAVINGS* | $14,937 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,345 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|
01 | 2.1224: Replace boiler | $8,072 | $36,600 | - |
$8,072
-
MMBtu
|
|
02 | 2.4226: Use / purchase optimum sized compressor | $4,981 | $17,000 |
$4,981
38,617
kWh
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,364 | $500 |
$1,364
10,577
kWh
|
- | |
04 | 2.2511: Insulate bare equipment | $520 | $62 | - |
$520
-
MMBtu
|
|
TOTAL RECOMMENDED | $14,937 | $54,162 |
$6,345
49,194
kWh
|
$8,592
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,345 | $17,500 |
$6,345
49,194
kWh
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs