ITAC Assessment: MA0760
ITAC logo
ITAC Assessment: MA0760
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Precast concrete products
NAICS 327320: Ready-Mix Concrete Manufacturing
SIC 3273: Ready-Mixed Concrete
Sales Range $10
M
to 50
M
# of Employees 74
Plant Area 18,400
ft2
Annual Production 40,000
pieces
Production Hrs. Annual 3,640
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,185 413,886
kWh
Electricity Demand $17,450 1,426
kW-mo/yr
Electricity Fees $3,270 -
LPG $4,826 260
MMBtu
Fuel Oil #2 $41,459 3,185
MMBtu
TOTAL YEARLY COSTS $120,190
RECOMMENDED SAVINGS* $14,937 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,345

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.1224: Replace boiler $8,072 $36,600 - $8,072
-
MMBtu
02 2.4226: Use / purchase optimum sized compressor $4,981 $17,000 $4,981
38,617
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,364 $500 $1,364
10,577
kWh
-
04 2.2511: Insulate bare equipment $520 $62 - $520
-
MMBtu
TOTAL RECOMMENDED $14,937 $54,162 $6,345
49,194
kWh
$8,592
-
MMBtu
TOTAL IMPLEMENTED $6,345 $17,500 $6,345
49,194
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs