| Assessment Year | 2001 |
|---|---|
| Principal Product | Precision parts machining and fabrication |
| NAICS |
n/a
|
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 450 |
| Plant Area |
241,000
ft2
|
| Annual Production | 2,754,737
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $537,353 | 10,430,600 |
kWh
|
$0.052 |
| Electricity Demand | $157,622 | 21,631 |
kW-mo/yr
|
$7.29 |
| Electricity Fees | $22,352 | - |
|
- |
| Natural Gas | $89,255 | 40,580 |
MMBtu
|
$2.20 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $123,536 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $118,398 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7221: Lower temperature during the winter season and vice-versa | $69,210 | - |
$69,210
1,502,931
kWh
|
- | - | |
| 02 | 2.8121: Apply for tax-free status for energy purchases | $29,986 | $11,995 | - | - | $29,986 | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,834 | $40 |
$7,834
170,088
kWh
|
- | - | |
| 04 | 2.8123: Pay utility bills on time | $6,210 | - | - | - | $6,210 | |
| 05 | 2.7124: Make a practice of turning off lights when not needed | $3,688 | $225 |
$2,741
59,520
kWh
|
$947
-
kW-mo/yr
|
- | |
| 06 | 2.2123: Insulate feedwater tank | $2,564 | $181 |
$2,564
55,686
kWh
|
- | - | |
| 07 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $1,450 | $333 |
$1,450
31,476
kWh
|
- | - | |
| 08 | 2.7135: Install occupancy sensors | $1,319 | $460 |
$1,319
28,639
kWh
|
- | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $755 | $984 |
$523
11,348
kWh
|
$232
-
kW-mo/yr
|
- | |
| 10 | 2.7124: Make a practice of turning off lights when not needed | $520 | - |
$335
7,271
kWh
|
$185
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $123,536 | $14,218 |
$85,976
1,866,959
kWh
|
$1,364
-
kW-mo/yr
|
$36,196 | ||
| TOTAL IMPLEMENTED | $118,398 | $13,660 |
$81,785
1,775,963
kWh
|
$417
-
kW-mo/yr
|
$36,196 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs