Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

124

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Carburetors, pistons, piston rings, and valves
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CI0033 #07 Y:2024 Use most efficient type of electric motors $1,126 $780
CI0033 #06 Y:2024 Use photocell controls $5,863 $5,400
CI0033 #05 Y:2024 Separate controls of air handlers from ac/ heating systems $10,622 $800
CI0033 #04 Y:2024 Adjust / maintain fork lift trucks for most efficient operation $15,193 $60,000
CI0033 #03 Y:2024 Replace existing hvac unit with high efficiency model $18,262 $72,000
CI0033 #02 Y:2024 Recover waste heat from equipment $27,212 $6,000
CI0033 #01 Y:2024 Use solar heat to make electricty $104,681 $874,600
MU0009 #06 Y:2022 Utilize higher efficiency lamps and/or ballasts $348 $795
MU0009 #05 Y:2022 Install occupancy sensors $352 -
MU0009 #04 Y:2022 Recharge batteries on during off-peak demand periods $821 $90
MU0009 #03 Y:2022 Isolate hot or cold equipment $1,187 -
MU0009 #02 Y:2022 Conserve energy by efficient use of vending machines $3,019 $855
MU0009 #01 Y:2022 Minimize operation of equipment maintained in standby condition $9,128 -
NC0459 #09 Y:2012 Eliminate or reduce compressed air usage $313 $750
NC0459 #08 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $2,985 $600
NC0459 #07 Y:2012 Install occupancy sensors $222 $300
NC0459 #06 Y:2012 Utilize higher efficiency lamps and/or ballasts $1,036 $624
NC0459 #05 Y:2012 Utilize higher efficiency lamps and/or ballasts $1,052 $1,980
NC0459 #04 Y:2012 Utilize higher efficiency lamps and/or ballasts $2,710 $4,085
NC0459 #03 Y:2012 Utilize higher efficiency lamps and/or ballasts $9,925 $8,552