ITAC Assessment: MU0009
ITAC logo
ITAC Assessment: MU0009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product piston rings and engine plates
NAICS 336310: Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3592: Carburetors, Pistons, Piston Rings, and Valves
Sales Range $50
M
to 100
M
# of Employees 230
Plant Area 200,000
ft2
Annual Production 49,920,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $917,015 11,928,874
kWh
Electricity Demand $72,832 30,347
kW-mo/yr
Electricity Fees $100,898 -
Natural Gas $203,434 75,205
MMBtu
TOTAL YEARLY COSTS $1,294,180
RECOMMENDED SAVINGS* $14,854 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,726

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.6242: Minimize operation of equipment maintained in standby condition $9,128 - $9,128
113,708
kWh
- - -
02 2.6211: Conserve energy by efficient use of vending machines $3,019 $855 $3,008
37,604
kWh
$10
-
kW-mo/yr
- -
03 2.2522: Isolate hot or cold equipment $1,187 - - - - $1,187
-
MMBtu
04 2.3132: Recharge batteries on during off-peak demand periods $821 $90 - $227
-
kW-mo/yr
$595 -
05 2.7135: Install occupancy sensors $352 - $352
4,380
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $348 $795 $348
4,336
kWh
- - -
TOTAL RECOMMENDED $14,854 $1,740 $12,836
160,028
kWh
$237
-
kW-mo/yr
$595 $1,187
-
MMBtu
TOTAL IMPLEMENTED $5,726 $1,740 $3,708
46,320
kWh
$237
-
kW-mo/yr
$595 $1,187
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs