23
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Air-conditioning and warm air heating equipment and commercial and industrial refrigeration equipment | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0942 #08 Y:2015 | 08 | 2015 | Contract a wood pallet recycling company | $1,368 | - | |
| UD0942 #07 Y:2015 | 07 | 2015 | Reduce ventilation air | $1,533 | - | |
| UD0942 #06 Y:2015 | 06 | 2015 | Reduce ventilation air | $7,691 | $28,200 | |
| UD0942 #05 Y:2015 | 05 | 2015 | Lower temperature during the winter season and vice-versa | $10,803 | $9,350 | |
| UD0942 #04 Y:2015 | 04 | 2015 | Replace electrically-operated equipment with fossil fuel equipment | $2,967 | $4,500 | |
| UD0942 #03 Y:2015 | 03 | 2015 | Install occupancy sensors | $2,012 | $810 | |
| UD0942 #02 Y:2015 | 02 | 2015 | Reduce the pressure of compressed air to the minimum required | $245 | $35 | |
| UD0942 #01 Y:2015 | 01 | 2015 | Change rate schedules or other changes in utility service | $1,296 | $50 | |
| UD0479 #04 Y:1995 | 04 | 1995 | Utilize higher efficiency lamps and/or ballasts | $7,184 | $14,654 | |
| UD0479 #03 Y:1995 | 03 | 1995 | Utilize higher efficiency lamps and/or ballasts | $8,152 | $17,500 | |
| UD0479 #02 Y:1995 | 02 | 1995 | Replace electrically-operated equipment with fossil fuel equipment | $12,043 | $16,000 | |
| UD0479 #01 Y:1995 | 01 | 1995 | Meter recycled water (to reduce sewer charges) | $1,667 | - | |
| UD0461 #06 Y:1995 | 06 | 1995 | Use evaporation to concentrate material | $14,223 | $20,000 | |
| UD0461 #05 Y:1995 | 05 | 1995 | Replace electrically-operated equipment with fossil fuel equipment | $3,483 | $1,000 | |
| UD0461 #04 Y:1995 | 04 | 1995 | Utilize higher efficiency lamps and/or ballasts | $9,525 | $14,640 | |
| UD0461 #03 Y:1995 | 03 | 1995 | Utilize higher efficiency lamps and/or ballasts | $2,923 | - | |
| UD0461 #02 Y:1995 | 02 | 1995 | Reschedule plant operations or reduce load to avoid peaks | $4,437 | - | |
| UD0461 #01 Y:1995 | 01 | 1995 | Replace electrically-operated equipment with fossil fuel equipment | $28,758 | $45,000 | |
| UD0113 #05 Y:1983 | 05 | 1983 | Use computer programs to optimize hvac performance | $13,999 | $30,000 | |
| UD0113 #04 Y:1983 | 04 | 1983 | Insulate bare equipment | $608 | $200 |