Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Air-conditioning and warm air heating equipment and commercial and industrial refrigeration equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0942 #08 Y:2015 Contract a wood pallet recycling company $1,368 -
UD0942 #07 Y:2015 Reduce ventilation air $1,533 -
UD0942 #06 Y:2015 Reduce ventilation air $7,691 $28,200
UD0942 #05 Y:2015 Lower temperature during the winter season and vice-versa $10,803 $9,350
UD0942 #04 Y:2015 Replace electrically-operated equipment with fossil fuel equipment $2,967 $4,500
UD0942 #03 Y:2015 Install occupancy sensors $2,012 $810
UD0942 #02 Y:2015 Reduce the pressure of compressed air to the minimum required $245 $35
UD0942 #01 Y:2015 Change rate schedules or other changes in utility service $1,296 $50
UD0479 #04 Y:1995 Utilize higher efficiency lamps and/or ballasts $7,184 $14,654
UD0479 #03 Y:1995 Utilize higher efficiency lamps and/or ballasts $8,152 $17,500
UD0479 #02 Y:1995 Replace electrically-operated equipment with fossil fuel equipment $12,043 $16,000
UD0479 #01 Y:1995 Meter recycled water (to reduce sewer charges) $1,667 -
UD0461 #06 Y:1995 Use evaporation to concentrate material $14,223 $20,000
UD0461 #05 Y:1995 Replace electrically-operated equipment with fossil fuel equipment $3,483 $1,000
UD0461 #04 Y:1995 Utilize higher efficiency lamps and/or ballasts $9,525 $14,640
UD0461 #03 Y:1995 Utilize higher efficiency lamps and/or ballasts $2,923 -
UD0461 #02 Y:1995 Reschedule plant operations or reduce load to avoid peaks $4,437 -
UD0461 #01 Y:1995 Replace electrically-operated equipment with fossil fuel equipment $28,758 $45,000
UD0113 #05 Y:1983 Use computer programs to optimize hvac performance $13,999 $30,000
UD0113 #04 Y:1983 Insulate bare equipment $608 $200