| Assessment Year | 2025 |
|---|---|
| Principal Product | Commercial refrigeration |
| NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
| SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
| Sales Range | $50 M to 100M |
| # of Employees | 230 |
| Plant Area |
300,000
ft2
|
| Annual Production | 14,000
units
|
| Production Hrs. Annual | 5,460
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $345,876 | 3,839,044 |
kWh
|
$0.090 | |
| Electricity Demand | $127,051 | 8,652 |
kW-mo/yr
|
$14.68 | |
| Electricity Fees | $1,098 | - |
|
- | |
| Natural Gas | $62,428 | 6,491 |
MMBtu
|
$9.62 | |
| Waste Disposal Costs | |||||
| Water Usage | $3,088 | 377 |
Tgal
|
$8.19 | |
| Water Disposal | $13,631 | 47,479 |
Tgal
|
$0.29 | |
| TOTAL YEARLY COSTS | $553,171 | ||||
| RECOMMENDED SAVINGS* | $161,305 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $99,224 | $613,200 |
$75,982
844,238
kWh
|
$23,242
-
kW-mo/yr
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,814 | $400 |
$7,814
86,820
kWh
|
- | - | |
| 03 | 2.7135: Install occupancy sensors | $1,624 | $2,466 |
$1,624
18,044
kWh
|
- | - | |
| 04 | 4.661: Level zero – install control systems for existing equipment | $52,643 | $67,500 | - | - |
$52,643
-
MMBtu
|
|
| TOTAL RECOMMENDED | $161,305 | $683,566 |
$85,420
949,103
kWh
|
$23,242
-
kW-mo/yr
|
$52,643
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs