Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Commercial laundry, drycleaning, and pressing machines
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0529 #09 Y:2023 Install compressor air intakes in coolest locations $99 $494
SU0529 #08 Y:2023 Replace fossil fuel equipment with electrical equipment $8,392 $24,000
SU0529 #07 Y:2023 Utilize higher efficiency lamps and/or ballasts $1,318 $2,488
SU0529 #06 Y:2023 Install occupancy sensors $158 $274
SU0529 #05 Y:2023 Use solar heat to make electricty $23,544 $39,388
SU0529 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $3,688 $6,050
SU0529 #03 Y:2023 Use or replace with energy efficient substitutes $1,775 $250
SU0529 #02 Y:2023 Reschedule plant operations or reduce load to avoid peaks $3,834 -
SU0529 #01 Y:2023 Disconnect ballasts $670 -
TT0158 #07 Y:2015 Disconnect ballasts $139 $139
TT0158 #06 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $761 $1,000
TT0158 #05 Y:2015 Repair and eliminate steam leaks $2,256 $400
TT0158 #04 Y:2015 Use waste heat from hot flue gases to preheat $2,406 $5,000
TT0158 #03 Y:2015 Increase amount of condensate returned $4,000 $150
TT0158 #02 Y:2015 Insulate bare equipment $4,934 $7,361
TT0158 #01 Y:2015 Utilize higher efficiency lamps and/or ballasts $15,995 $50,374
BS0025 #06 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $829 $977
BS0025 #05 Y:2013 Reduce the pressure of compressed air to the minimum required $444 $15
BS0025 #04 Y:2013 Utilize higher efficiency lamps and/or ballasts $208 $1,211
BS0025 #03 Y:2013 Install occupancy sensors $626 $495