Assessment Year | 2013 |
---|---|
Principal Product | Commercial Laundry and Dry-cleaing Products |
NAICS | 333318: Other Commercial and Service Industry Machinery Manufacturing |
SIC | 3582: Commercial Laundry, Drycleaning, and Pressing Machines |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
60,000
ft2
|
Annual Production | 144
pieces
|
Production Hrs. Annual | 2,400
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $38,975 | 521,200 |
kWh
|
$0.075 |
Electricity Demand | $16,652 | 2,514 |
kW-mo/yr
|
$6.62 |
Natural Gas | $19,007 | 2,679 |
MMBtu
|
$7.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,979 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $6,335 | $1,104 | - |
$6,335
-
kW-mo/yr
|
- | |
02 | 2.7243: Improve air circulation with destratification fans / other methods | $3,537 | $6,138 |
$(-178.0)
(-2,376)
kWh
|
- |
$3,715
-
MMBtu
|
|
03 | 2.7135: Install occupancy sensors | $626 | $495 |
$626
8,349
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $208 | $1,211 |
$140
1,864
kWh
|
$68
-
kW-mo/yr
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $444 | $15 |
$239
3,185
kWh
|
$205
-
kW-mo/yr
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $829 | $977 |
$829
11,050
kWh
|
- | - | |
TOTAL RECOMMENDED | $11,979 | $9,940 |
$1,656
22,072
kWh
|
$6,608
-
kW-mo/yr
|
$3,715
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs