ITAC Assessment: GT0955
ITAC logo
ITAC Assessment: GT0955
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Manufactured Wood Products
NAICS 321912: Cut Stock, Resawing Lumber, and Planing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 18
Plant Area 85,000
ft2
Annual Production 15,740,793
units
Production Hrs. Annual 2,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,017 399,740
kWh
TOTAL YEARLY COSTS $72,017
RECOMMENDED SAVINGS* $88,777 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,559

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,515 $2,000 - $7,515 -
02 2.8121: Apply for tax-free status for energy purchases $5,146 $2,000 - $5,146 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,967 $1,850 $6,867
38,151
kWh
- $(-2,900.0)
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $295 $477 $295
1,640
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,445 $4,419 $1,445
8,029
kWh
- -
06 2.9114: Use solar heat to make electricty $70,408 $429,498 $70,408
390,841
kWh
- -
TOTAL RECOMMENDED $88,777 $440,244 $79,015
438,661
kWh
$12,661 $(-2,900.0)
TOTAL IMPLEMENTED $10,559 $8,269 $8,312
46,180
kWh
$5,146 $(-2,900.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs