ITAC Assessment: TT0158
ITAC logo
ITAC Assessment: TT0158
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Commercial Laundry
NAICS 333318: Other Commercial and Service Industry Machinery Manufacturing
SIC 3582: Commercial Laundry, Drycleaning, and Pressing Machines
Sales Range $5
M
to 10
M
# of Employees 82
Plant Area 55,000
ft2
Annual Production 4,784,000
lb
Production Hrs. Annual 3,224
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,403 633,800
kWh
Electricity Demand $13,153 2,968
kW-mo/yr
Natural Gas $95,765 13,129
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,491 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,934

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,995 $50,374 $10,368
102,044
kWh
$5,627
-
kW-mo/yr
-
02 2.2511: Insulate bare equipment $4,934 $7,361 - - $4,934
-
MMBtu
03 2.2121: Increase amount of condensate returned $4,000 $150 - - $4,000
-
MMBtu
04 2.2414: Use waste heat from hot flue gases to preheat $2,406 $5,000 - - $2,406
-
MMBtu
05 2.2135: Repair and eliminate steam leaks $2,256 $400 - - $2,256
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $761 $1,000 $491
4,836
kWh
$270
-
kW-mo/yr
-
07 2.7122: Disconnect ballasts $139 $139 $116
1,138
kWh
$23
-
kW-mo/yr
-
TOTAL RECOMMENDED $30,491 $64,424 $10,975
108,018
kWh
$5,920
-
kW-mo/yr
$13,596
-
MMBtu
TOTAL IMPLEMENTED $4,934 $7,361 - - $4,934
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs