ITAC Assessment: LE0394
ITAC logo
ITAC Assessment: LE0394
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Portuguese Bread
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $1
M
to 5
M
# of Employees 140
Plant Area 100,000
ft2
Annual Production 10,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $462,332 6,257,776
kWh
Electricity Demand $46,817 13,151
kW-mo/yr
Electricity Fees $217,002 -
Natural Gas $410,577 58,816
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $113,824 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7261: Install timers and/or thermostats $65,897 - $1,790
24,189
kWh
- $64,107
-
MMBtu
-
02 2.1224: Replace boiler $16,261 $75 - - $16,261
-
MMBtu
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,611 $25 $3,387
45,777
kWh
$224
-
kW-mo/yr
- -
04 2.2136: Install / repair insulation on steam lines $914 $200 - - $914
-
MMBtu
-
05 2.2443: Re-use or recycle hot or cold process exhaust air $11,973 $5,000 - - $11,973
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,528 $5,688 $2,806
37,914
kWh
$121
-
kW-mo/yr
- $601
07 2.1233: Analyze flue gas for proper air/fuel ratio $734 $1,500 - - $734
-
MMBtu
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,987 $4,340 $1,862
25,160
kWh
$125
-
kW-mo/yr
- -
09 2.2442: Preheat combustion air with waste heat $8,298 $20,000 - - $8,298
-
MMBtu
-
10 2.2136: Install / repair insulation on steam lines $207 $550 - - $207
-
MMBtu
-
11 2.7142: Utilize higher efficiency lamps and/or ballasts $415 $1,615 $322
4,347
kWh
$71
-
kW-mo/yr
- $22
TOTAL RECOMMENDED $113,824 $38,993 $10,166
137,387
kWh
$541
-
kW-mo/yr
$102,494
-
MMBtu
$623
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs