75
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Electronic computers | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
SD0650 #04 Y:2023 | 04 | 2023 | Use photocell controls | $2,366 | $2,165 | |
SD0650 #03 Y:2023 | 03 | 2023 | Install occupancy sensors | $786 | $1,463 | |
SD0650 #02 Y:2023 | 02 | 2023 | Use battery storage for demand control | $48,985 | - | |
SD0650 #01 Y:2023 | 01 | 2023 | Use solar heat to make electricty | $59,676 | $88,292 | |
SD0588 #04 Y:2019 | 04 | 2019 | Reduce the pressure of compressed air to the minimum required | $407 | - | |
SD0588 #03 Y:2019 | 03 | 2019 | Install occupancy sensors | $812 | $1,395 | |
SD0588 #02 Y:2019 | 02 | 2019 | Replace electrically-operated equipment with fossil fuel equipment | $2,578 | $7,495 | |
SD0588 #01 Y:2019 | 01 | 2019 | Utilize higher efficiency lamps and/or ballasts | $13,633 | $32,287 | |
LM0122 #05 Y:2006 | 05 | 2006 | Modify workload | $9,311 | $4,850 | |
LM0122 #04 Y:2006 | 04 | 2006 | Eliminate/reduce redundant inspections | $19,128 | $5,500 | |
LM0122 #03 Y:2006 | 03 | 2006 | Install occupancy sensors | $1,465 | $3,975 | |
LM0122 #02 Y:2006 | 02 | 2006 | Isolate hot or cold equipment | $814 | $2,000 | |
LM0122 #01 Y:2006 | 01 | 2006 | Replace existing hvac unit with high efficiency model | $42,830 | $89,250 | |
UF0376 #08 Y:2005 | 08 | 2005 | Lower temperature during the winter season and vice-versa | $148 | - | |
UF0376 #07 Y:2005 | 07 | 2005 | Utilize energy-efficient belts and other improved mechanisms | $369 | - | |
UF0376 #06 Y:2005 | 06 | 2005 | Utilize controls to operate equipment only when needed | $150 | $1,480 | |
UF0376 #05 Y:2005 | 05 | 2005 | Air condition only space necessary | $1,014 | $3,200 | |
UF0376 #04 Y:2005 | 04 | 2005 | Install back-up equipment | $1,632,456 | $5,315 | |
UF0376 #03 Y:2005 | 03 | 2005 | Add area lighting switches | $878 | $2,646 | |
UF0376 #02 Y:2005 | 02 | 2005 | Utilize higher efficiency lamps and/or ballasts | $1,222 | $2,053 |