Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product comm. & countermeasures
NAICS 334111: Electronic Computer Manufacturing
SIC 3571: Electronic Computers
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 110,000
ft2
Annual Production 1,500
pieces
Production Hrs. Annual 6,745
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $232,781 2,973,835
kWh
Electricity Demand $148,771 8,054
kW-mo/yr
Electricity Fees $4,843 -
Natural Gas $5,200 520
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,548 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,439

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7232: Replace existing hvac unit with high efficiency model $42,830 $89,250 $42,830
329,460
kWh
-
02 2.2522: Isolate hot or cold equipment $814 $2,000 $814
6,264
kWh
-
03 2.7135: Install occupancy sensors $1,465 $3,975 $949
11,974
kWh
$516
-
kW-mo/yr
04 4.425: Eliminate/reduce redundant inspections $19,128 $5,500 $19,128
110,032
kWh
-
05 4.426: Modify workload $9,311 $4,850 $9,311
118,953
kWh
-
TOTAL RECOMMENDED $73,548 $105,575 $73,032
576,683
kWh
$516
-
kW-mo/yr
TOTAL IMPLEMENTED $28,439 $10,350 $28,439
228,985
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs