ITAC Assessment: CO0137
ITAC logo
ITAC Assessment: CO0137
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product OPTICAL STORAGE DISK
NAICS
n/a
SIC 3572: Computer Storage Devices
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area
n/a
Annual Production 2,000
pieces
Production Hrs. Annual 5,616
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,598 3,983,880
kWh
Natural Gas $4,627 1,122
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,154 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,247

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4131: Size electric motors for peak operating efficiency $1,200 $500 $1,200
11,430
kWh
-
02 2.3212: Optimize plant power factor $4,000 $5,850 $4,000
-
kWh
-
03 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $6,070 $19,800 $6,070
137,749
kWh
-
04 2.2437: Recover waste heat from equipment $257 $500 $152
3,517
kWh
$105
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $65 $200 $65
1,465
kWh
-
06 2.4239: Eliminate or reduce compressed air usage $2,725 $4,000 $2,725
61,841
kWh
-
07 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $427 $370 $157
3,517
kWh
$270
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $410 $800 $410
9,379
kWh
-
TOTAL RECOMMENDED $15,154 $32,020 $14,779
228,898
kWh
$375
-
MMBtu
TOTAL IMPLEMENTED $8,247 $11,050 $8,142
78,253
kWh
$105
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs