Assessment Year | 1988 |
---|---|
Principal Product | OPTICAL STORAGE DISK |
NAICS |
n/a
|
SIC | 3572: Computer Storage Devices |
Sales Range | $10 M to 50M |
# of Employees | 280 |
Plant Area |
n/a
|
Annual Production | 2,000
pieces
|
Production Hrs. Annual | 5,616
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $175,598 | 3,983,880 |
kWh
|
$0.044 |
Natural Gas | $4,627 | 1,122 |
MMBtu
|
$4.12 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,154 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,247 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4131: Size electric motors for peak operating efficiency | $1,200 | $500 |
$1,200
11,430
kWh
|
- | |
02 | 2.3212: Optimize plant power factor | $4,000 | $5,850 |
$4,000
-
kWh
|
- | |
03 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $6,070 | $19,800 |
$6,070
137,749
kWh
|
- | |
04 | 2.2437: Recover waste heat from equipment | $257 | $500 |
$152
3,517
kWh
|
$105
-
MMBtu
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $65 | $200 |
$65
1,465
kWh
|
- | |
06 | 2.4239: Eliminate or reduce compressed air usage | $2,725 | $4,000 |
$2,725
61,841
kWh
|
- | |
07 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $427 | $370 |
$157
3,517
kWh
|
$270
-
MMBtu
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $410 | $800 |
$410
9,379
kWh
|
- | |
TOTAL RECOMMENDED | $15,154 | $32,020 |
$14,779
228,898
kWh
|
$375
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,247 | $11,050 |
$8,142
78,253
kWh
|
$105
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs