ITAC Assessment: UF0376
ITAC logo
ITAC Assessment: UF0376
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product electronics
NAICS 334111: Electronic Computer Manufacturing
SIC 3571: Electronic Computers
Sales Range $10
M
to 50
M
# of Employees 76
Plant Area 96,000
ft2
Annual Production 1,098
ton
Production Hrs. Annual 2,805
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,793 894,000
kWh
Electricity Demand $9,802 2,589
kW-mo/yr
Natural Gas $28,493 4,512
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,640,205 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,968 $27,399 $3,336
48,350
kWh
$632
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,222 $2,053 $1,025
14,863
kWh
$197
-
kW-mo/yr
-
03 2.7131: Add area lighting switches $878 $2,646 $878
12,719
kWh
- -
04 4.651: Install back-up equipment $1,632,456 $5,315 - $456
-
kW-mo/yr
$1,632,000
05 2.7229: Air condition only space necessary $1,014 $3,200 $1,014
14,696
kWh
- -
06 2.6231: Utilize controls to operate equipment only when needed $150 $1,480 $102
1,477
kWh
$48
-
kW-mo/yr
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $369 - $369
966
kWh
- -
08 2.7221: Lower temperature during the winter season and vice-versa $148 - $148
1,849
kWh
- -
TOTAL RECOMMENDED $1,640,205 $42,093 $6,872
94,920
kWh
$1,333
-
kW-mo/yr
$1,632,000
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs