Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

480

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC General industrial machinery and equipment, not elsewhere
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0687 #06 Y:2026 Use battery storage for demand control $6,128 $249
SD0687 #05 Y:2026 Use solar heat to make electricty $168,511 $172,626
SD0687 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $87 $169
SD0687 #03 Y:2026 Reduce the pressure of compressed air to the minimum required $965 -
SD0687 #02 Y:2026 Install direct acting units in place of compressed air pressure system in safety system $576 $1,200
SD0687 #01 Y:2026 Replace existing chiller with high efficiency model $3,112 $3,000
MU0078 #10 Y:2025 Install partitions to reduce size of conditioned space $131 -
MU0078 #09 Y:2025 Use proper thickness of insulation on building envelope $2,407 $6,214
MU0078 #08 Y:2025 Utilize higher efficiency lamps and/or ballasts $423 $442
MU0078 #07 Y:2025 Install occupancy sensors $1,410 $1,056
MU0078 #06 Y:2025 Use photocell controls $928 $4,410
MU0078 #05 Y:2025 Conserve energy by efficient use of vending machines $1,299 $528
MU0078 #04 Y:2025 Keep equipment clean $524 -
MU0078 #03 Y:2025 Use optimum temperature $208 -
MU0078 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $3,235 $13,944
MU0078 #01 Y:2025 Replace fossil fuel equipment with electrical equipment $12,550 $145,000
MZ0374 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $5,683 $8,662
MZ0374 #05 Y:2025 Remove or close off unneeded compressed air lines $1,884 $4,020
MZ0374 #04 Y:2025 Eliminate or reduce compressed air usage $10,170 $7,950
MZ0374 #03 Y:2025 Install occupancy sensors $165 $415