Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

464

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC General industrial machinery and equipment, not elsewhere
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0374 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $5,683 $8,662
MZ0374 #05 Y:2025 Remove or close off unneeded compressed air lines $1,884 $4,020
MZ0374 #04 Y:2025 Eliminate or reduce compressed air usage $10,170 $7,950
MZ0374 #03 Y:2025 Install occupancy sensors $165 $415
MZ0374 #02 Y:2025 Re-use or recycle hot or cold process exhaust air $4,818 $13,380
MZ0374 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,642 $3,212
MU0028 #08 Y:2023 Use proper thickness of insulation on building envelope $490 $1,162
MU0028 #07 Y:2023 Install vinyl strip / high speed / air curtain doors $550 $776
MU0028 #06 Y:2023 Utilize higher efficiency lamps and/or ballasts $643 $1,100
MU0028 #05 Y:2023 Install occupancy sensors $863 $112
MU0028 #04 Y:2023 Use photocell controls $138 $348
MU0028 #03 Y:2023 Reduce illumination to minimum necessary levels $1,919 -
MU0028 #02 Y:2023 Turn off equipment when not in use $2,322 -
MU0028 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,186 -
SU0531 #11 Y:2023 Install compressor air intakes in coolest locations $1,818 $8,523
SU0531 #10 Y:2023 Use proper thickness of insulation on building envelope $1,531 $2,041
SU0531 #09 Y:2023 Recover waste heat from equipment $428 $528
SU0531 #08 Y:2023 Use solar heat to make electricty $32,789 $29,395
SU0531 #07 Y:2023 Install vinyl strip / high speed / air curtain doors $1,355 $156
SU0531 #06 Y:2023 Utilize higher efficiency lamps and/or ballasts $1,000 $102