Assessment Year | 2023 |
---|---|
Principal Product | Air Filtration Products and Media |
NAICS | 333912: Air and Gas Compressor Manufacturing |
SIC | 3569: General Industrial Machinery and Equipment, Not Elsewhere |
Sales Range | $100 M to 500M |
# of Employees | 100 |
Plant Area |
155,000
ft2
|
Annual Production | 100,000
units
|
Production Hrs. Annual | 4,290
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $68,666 | 1,852,961 |
kWh
|
$0.037 |
Electricity Demand | $66,769 | 6,214 |
kW-mo/yr
|
$10.75 |
Electricity Fees | $12,584 | - |
|
- |
Natural Gas | $26,652 | 15,131 |
MMBtu
|
$1.76 |
TOTAL YEARLY COSTS | $174,672 | |||
RECOMMENDED SAVINGS* | $59,012 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $6,031 | - | - | - | - | $6,031 | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,557 | - | - |
$3,557
-
kW-mo/yr
|
- | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $8,464 | - |
$8,464
228,377
kWh
|
- | - | - | |
04 | 2.7122: Disconnect ballasts | $603 | - |
$336
9,060
kWh
|
$268
-
kW-mo/yr
|
- | - | |
05 | 2.4322: Use or replace with energy efficient substitutes | $1,436 | $70 |
$972
26,276
kWh
|
$790
-
kW-mo/yr
|
$(-326.5)
-
MMBtu
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,000 | $102 |
$97
2,621
kWh
|
$39
-
kW-mo/yr
|
- | $864 | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,355 | $156 | - | - |
$1,355
-
MMBtu
|
- | |
08 | 2.9114: Use solar heat to make electricty | $32,789 | $29,395 |
$10,612
286,810
kWh
|
$22,177
-
kW-mo/yr
|
- | - | |
09 | 2.2437: Recover waste heat from equipment | $428 | $528 | - | - |
$428
-
MMBtu
|
- | |
10 | 2.7492: Use proper thickness of insulation on building envelope | $1,531 | $2,041 | - | - |
$1,531
-
MMBtu
|
- | |
11 | 2.4221: Install compressor air intakes in coolest locations | $1,818 | $8,523 |
$1,818
49,127
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $59,012 | $40,815 |
$22,299
602,271
kWh
|
$26,831
-
kW-mo/yr
|
$2,987
-
MMBtu
|
$6,895 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs