ITAC Assessment: UM0294
ITAC logo
ITAC Assessment: UM0294
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Commercial Heat Treated Metal Parts
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range n/a
# of Employees 37
Plant Area 105,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,488
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $174,960 5,569,803
kWh
Electricity Demand $105,158 11,009
kW-mo/yr
Electricity Fees $960 -
Natural Gas $376,141 50,417
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,403 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2514: Cover open tanks $48,559 $7,232 $48,111
962,212
kWh
- $448
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,274 $600 $6,236
198,517
kWh
$3,038
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,684 $4,536 $3,729
118,727
kWh
$1,955
-
kW-mo/yr
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $3,051 $2,400 - - $3,051
-
MMBtu
05 2.7444: Close holes and openings in building such as broken windows $1,604 $3,000 - - $1,604
-
MMBtu
06 2.2511: Insulate bare equipment $1,231 $1,344 - - $1,231
-
MMBtu
TOTAL RECOMMENDED $69,403 $19,112 $58,076
1,279,456
kWh
$4,993
-
kW-mo/yr
$6,334
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs