282
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Speed changers, industrial high-speed drives, and gears | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| CI0080 #08 Y:2026 | 08 | 2026 | Replace fossil fuel equipment with electrical equipment | $2,020 | $7,000 |
n/a
|
| CI0080 #07 Y:2026 | 07 | 2026 | Optimize plant power factor | $2,237 | $6,500 |
n/a
|
| CI0080 #06 Y:2026 | 06 | 2026 | Convert to high volume low pressure (hvlp) paint guns | $3,360 | $7,500 |
n/a
|
| CI0080 #05 Y:2026 | 05 | 2026 | Install or upgrade insulation on hvac distribution systems | $5,763 | $30,000 |
n/a
|
| CI0080 #04 Y:2026 | 04 | 2026 | Reduce the pressure of compressed air to the minimum required | $12,133 | $7,225 |
n/a
|
| CI0080 #03 Y:2026 | 03 | 2026 | Adjust / maintain fork lift trucks for most efficient operation | $39,972 | $78,000 |
n/a
|
| CI0080 #02 Y:2026 | 02 | 2026 | Size air handling grills/ duct/s coils to minimize air resistance | $50,000 | $365,000 |
n/a
|
| CI0080 #01 Y:2026 | 01 | 2026 | Replace existing equipment with more suitable substitutes | $230,000 | $1,000,000 |
n/a
|
| MU0079 #07 Y:2025 | 07 | 2025 | Pay bills on time to avoid late fees | $1,800 | - | |
| MU0079 #06 Y:2025 | 06 | 2025 | Install occupancy sensors | $2,030 | $3,314 | |
| MU0079 #05 Y:2025 | 05 | 2025 | Use photocell controls | $121 | $286 | |
| MU0079 #04 Y:2025 | 04 | 2025 | Utilize controls to operate equipment only when needed | $3,238 | $3,797 | |
| MU0079 #03 Y:2025 | 03 | 2025 | Install compressor air intakes in coolest locations | $1,020 | $3,218 | |
| MU0079 #02 Y:2025 | 02 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,989 | $320 | |
| MU0079 #01 Y:2025 | 01 | 2025 | Replace existing hvac unit with high efficiency model | $33,104 | $284,789 | |
| IC0329 #06 Y:2025 | 06 | 2025 | Reduce the pressure of compressed air to the minimum required | $217 | - | |
| IC0329 #05 Y:2025 | 05 | 2025 | Use or replace with energy efficient substitutes | $1,588 | $1,315 | |
| IC0329 #04 Y:2025 | 04 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,312 | - | |
| IC0329 #03 Y:2025 | 03 | 2025 | Use or replace with energy efficient substitutes | $511 | $800 | |
| IC0329 #02 Y:2025 | 02 | 2025 | Eliminate or reduce compressed air usage | $963 | $720 |