ITAC Assessment: SU0485
ITAC logo
ITAC Assessment: SU0485
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Large Machined Parts
NAICS 333612: Speed Changer, Industrial High-Speed Drive, and Gear Manufacturing
SIC 3566: Speed Changers, Industrial High-Speed Drives, and Gears
Sales Range $10
M
to 50
M
# of Employees 98
Plant Area 178,000
ft2
Annual Production 15,300
units
Production Hrs. Annual 5,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $240,591 10,892,385
kWh
Electricity Demand $143,215 20,080
kW-mo/yr
Electricity Fees $21,374 -
Natural Gas $76,743 16,435
MMBtu
Waste Disposal Costs
Water Usage $4,600 1,500,000
Tgal
TOTAL YEARLY COSTS $486,523
RECOMMENDED SAVINGS* $37,440 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,921

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,025 - $1,025
47,205
kWh
- - -
02 2.8121: Apply for tax-free status for energy purchases $3,064 $264 - - - $3,064
03 2.4322: Use or replace with energy efficient substitutes $344 $75 $158
7,200
kWh
$321
-
kW-mo/yr
$(-135.0)
-
MMBtu
-
04 2.8121: Apply for tax-free status for energy purchases $707 $264 - - - $707
05 3.1161: Eliminate/reduce an operation $10,786 $6,500 $(-57.2)
(-2,600)
kWh
$(-889.8)
-
kW-mo/yr
- $11,733
06 2.7314: Reduce ventilation air $1,310 $944 $289
13,137
kWh
- $1,021
-
MMBtu
-
07 2.4221: Install compressor air intakes in coolest locations $2,923 $2,832 $2,923
132,872
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $387 $415 $91
4,117
kWh
$40
-
kW-mo/yr
- $256
09 2.7134: Use photocell controls $1,305 $1,645 $1,305
59,331
kWh
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $15,242 $26,026 $6,493
295,190
kWh
$4,607
-
kW-mo/yr
- $4,142
11 2.6211: Conserve energy by efficient use of vending machines $347 $1,404 $347
15,768
kWh
- - -
TOTAL RECOMMENDED $37,440 $40,369 $12,574
572,220
kWh
$4,078
-
kW-mo/yr
$886
-
MMBtu
$19,902
TOTAL IMPLEMENTED $22,921 $31,182 $10,812
491,510
kWh
$4,647
-
kW-mo/yr
- $7,462
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs