Assessment Year | 1988 |
---|---|
Principal Product | CUSTOM METAL FABRICATION |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $5 M to 10M |
# of Employees | 80 |
Plant Area |
n/a
|
Annual Production | 8,000,000
lb
|
Production Hrs. Annual | 4,600
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $31,369 | 409,730 |
kWh
|
$0.077 |
Natural Gas | $9,082 | 2,030 |
MMBtu
|
$4.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $4,273 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,393 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $677 | - |
$1,108
42,497
kWh
|
$(-431.0)
-
MMBtu
|
- | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $880 | $1,200 |
$1,278
12,603
kWh
|
$(-398.0)
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,732 | $3,790 |
$1,597
28,722
kWh
|
$(-145.0)
-
MMBtu
|
$280 | |
04 | 2.7494: Install storm windows and doors | $984 | $929 | - |
$984
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $4,273 | $5,919 |
$3,983
83,822
kWh
|
$10
-
MMBtu
|
$280 | ||
TOTAL IMPLEMENTED | $3,393 | $4,719 |
$2,705
71,219
kWh
|
$408
-
MMBtu
|
$280 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs